NOAA-19Subject:ground-segment-maintenanceImpact:risk-of-interruptionDetail:= Due to ground segment maintenance a period of up to two hours of interruption might be observed during the mentioned period.Status:scheduledIssue Time:2018-03-21 15:49:23.0Services:SEM L0 - Metop-AAVHRR Level 1 - Metop-AAMSU-A Level 1 - Metop-AMHS Level 1 - Metop-AGRAS Level 1 - Metop-AASCAT Level 1 - Metop-AIASI Level 1 - Metop-AHIRS Level 1 - Metop-AGOME-2 Level 1 - Metop-AATOVS Sounding products - Metop-AIASI Sounding Products - Metop-AASCAT Soil Moisture - Metop-AAVHRR Polar Winds - Metop-AMulti-Sensor Products - Metop-ASEM L0 - Metop-BAMSU-A Level 1 - Metop-BAVHRR Level 1 - Metop-BMHS Level 1 - Metop-BHIRS Level 1 - Metop-BIASI Level 1 - Metop-BASCAT Level 1 - Metop-BGOME-2 Level 1 - Metop-BATOVS Sounding products - Metop-BGRAS Level 1 - Metop-BASCAT Soil Moisture - Metop-BIASI Sounding Products - Metop-BAVHRR Polar Winds - Metop-BMulti-Sensor Products - Metop-BMulti-Metop Wind ProductsAMSU-A Level 1 - NOAAAVHRR Level 1 - NOAAMHS Level 1 - NOAAHIRS Level 1 - NOAAATOVS Sounding products - NOAAOSI SAF - ProductsAC SAF - ProductsROM SAF - ProductsH-SAF - ProductsType:Planned MaintenanceAnn Nr:3691Rev:1Start Time:2018-03-29 18:50:00.0End Time:2018-03-29