rgb(171,171,171);font-size:11px">Subject:instrum= ent-calibrationImpact:<= u>data-unavailable<= /u>Detail:GOME2 monthly measurements of GOME-2 polarisation (PMD) data= in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column produ= cts (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) wi= ll be unavailable.Statu= s:scheduledIssue Time:2018-03-21 15:43:10.0Services:GOME-2 Level 1 - Metop-B
GOME-= 2 AHRPT Metop-B
AC SAF - Products

Type:Service EnhancementAnn Nr:3649= Rev:2= Start Time:2018-04-04 09:00:00.0End Time:2018-04-04 09:0= 0:00.0Sub= ject:product-change= Detail:Release of new Processing Baselines for Sentinel-3A SLSTR= Level 1 and Level 2 data. For details on the changes, see the URL provided= below. [Rev. 2]: Release postponed to=C2=A0= 04/04/2018.Url:http://www.eumetsat.int/= website/home/News/DAT_3842638.htmlStatus:scheduledIssue Time:2018-03-08 12:18:48.0<= /tr>Services:SLSTR Lev= el 1 Products - S3A
SLSTR Level 2 Marine Products - S3A

<= td nowrap class=3D"gmail-m_188441820679421468detailLabel" width=3D"10%" ali= gn=3D"RIGHT" style=3D"font-family:Arial,Verdana,sans-serif;margin:0px;backg= round-color:rgb(250,250,250);color:rgb(77,77,77);font-weight:bold;text-alig= n:right;border-bottom:1px solid rgb(171,171,171);border-right:1px solid rgb= (171,171,171);font-size:11px">Ann Nr:
Type:Service Enhancement
3694
Rev:1
Start Time:2018-04-04 09:00:00.0
End Time:2018-04-04 09:00:00.0