Subject: ground-segment-maintenance Impact: risk-of-interruption Detail: The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system might be interrupted during the maintenance window. Status: scheduled Issue Time: 2018-04-27 14:16:45.0 Services: SEM L0 - Metop-B AVHRR Level 1 - Metop-B AMSU-A Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GOME-2 Level 1 - Metop-B GRAS Level 1 - Metop-B ASCAT Soil Moisture - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Type: Service Enhancement Ann Nr: 3759 Rev: 2 Start Time: 2018-05-03 09:00:00.0 End Time: 2018-05-03 09:00:00.0