Subject: instrument-maintenance
Detail: During the indicated period, the GRAS receiver
onboard
Metop-A will undergo a series of tracking parameter tests aiming
at improving the signal characteristics of rising
occultations. In
particular, the campaign aims at reducing vertical error
correlations of bending angles in the lower stratosphere, at the
same time minimizing side effects. During this period, the number
of daily occultations from Metop-A as well as the penetration of
rising occultations into the mid and lower troposphere might vary
more than usual. [Rev. 2]: End Time updated.
Status: scheduled
Issue Time: 2017-12-07 16:11:46.0
Services: GRAS Level 1 - Metop-A
GRAS AHRPT Metop-A
Type: Planned Maintenance
Ann Nr: 3410
Rev: 1
Start Time: 2018-01-26 00:00:00.0
End Time: 2018-02-19 00:00:00.0
Satellites: Metop-A
Subsystem: GOME-2