Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: Routine in-plane manoeuvre. Reduced data quality
should
be expected for data sensed during this period. The exact burn time
will be announced closer to the day of the manoeuvre. [Rev. 2]: The
manoeuvre has been postponed by one week to 03/05/2017. [Rev. 3]:
Burn time = 12:39:30 UTC. Burn duration = 0.635 seconds.
Status: scheduled
Issue Time: 2017-04-05 13:16:31.0
Services: SEM L0 - Metop-B
AVHRR Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
MHS Level 1 - Metop-B
HIRS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
IASI Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
GRAS Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
Multi-Metop Wind Products
EARS-ATOVS
EARS-AVHRR
EARS-ASCAT
EARS-IASI
AMSU-A AHRPT Metop-B
AVHRR AHRPT Metop-B
ASCAT AHRPT Metop-B
GOME-2 AHRPT Metop-B
GRAS AHRPT Metop-B
HIRS AHRPT Metop-B
IASI AHRPT Metop-B
MHS AHRPT Metop-B
SEM AHRPT Metop-B
OSI SAF - Products
AC SAF - Products
ROM SAF - Products
H-SAF - Products
Type: Planned Maintenance
Ann Nr: 2842
Rev: 1
Start Time: 2017-05-06 06:35:00.0
End Time: 2017-05-06 06:48:00.0
Satellites: Suomi NPP