Subject: instrument-calibration Impact: data-unavailable Detail: GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. Status: scheduled Issue Time: 2017-08-02 15:06:48.0 Services: GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products Name: EUMETSAT Address: Eumetsat-Allee 1 D-64295 Darmstadt Germany Telephone: +49 6151 807 3660/3770 Fax: +49 6151 807 3790 E-mail: ops@eumetsat.int Internet: www.eumetsat.int You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required). Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system. --Boundary_(ID_ZbQiKgryZnYdvYgM+2MInQ) Content-type: text/html; charset=utf-8 Content-transfer-encoding: 8BIT
Topic: Eumetsat Weekly Operations ScheduleDate/Time Issued: August 07,
2017 1550Z
Product(s) or Data Impacted: See list below.
Date/Time of Initial Impact: August 07, 2017 15:32:38Z (from the Eumetsat Weekly Operations Schedule message)
Date/Time of Expected End: See table in detail for on and off switch time
Length of Outage:
N/A
Details/Specifics of Change:
3960 | |
|
Mon Aug 07 15:32:38 UTC 2017 |
|
Service Enhancement |
|
3058 |
|
1 |
|
2017-07-21 08:00:00.0 |
|
FY-2E |
|
product-change |
|
no-impact |
|
The frequency of the FY-2E Humidity Products (HPF) has changed from 3-hourly to hourly dissemination via EUMETCcast. |
|
scheduled |
|
2017-08-03 12:17:22.0 |
|
FY-2 Products |
|
Planned Maintenance |
|
3054 |
|
1 |
|
2017-08-07 14:27:00.0 |
|
2017-08-07 14:34:00.0 |
|
Metop-A |
|
ASCAT |
|
instrument-calibration |
|
data-unavailable |
|
Gain Compression |
|
scheduled |
|
2017-08-02 15:09:43.0 |
|
EARS-ASCAT ASCAT Soil Moisture - Metop-A ASCAT Level 1 - Metop-A ASCAT AHRPT Metop-A OSI SAF - Products |
|
Planned Maintenance |
|
3057 |
|
1 |
|
2017-08-08 08:03:00.0 |
|
2017-08-08 08:10:00.0 |
|
Metop-B |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2017-08-02 15:30:55.0 |
|
SEM L0 - Metop-B SEM AHRPT Metop-B |
|
Planned Maintenance |
|
3056 |
|
1 |
|
2017-08-08 08:50:00.0 |
|
2017-08-08 08:57:00.0 |
|
Metop-A |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2017-08-02 15:29:40.0 |
|
SEM L0 - Metop-A SEM AHRPT Metop-A |
|
Planned Maintenance |
|
3055 |
|
1 |
|
2017-08-08 08:50:00.0 |
|
2017-08-08 10:33:00.0 |
|
Metop-A |
|
SEM |
|
TED |
|
instrument-calibration |
|
data-unavailable |
|
SEM TED in flight calibration. |
|
scheduled |
|
2017-08-02 15:28:54.0 |
|
SEM L0 - Metop-A SEM AHRPT Metop-A |
|
Planned Maintenance |
|
3066 |
|
1 |
|
2017-08-09 07:00:00.0 |
|
2017-08-09 11:00:00.0 |
|
ground-segment-maintenance |
|
risk-of-interruption |
|
Essential Ground Station Maintenance. There is a risk for interruptions or degradation during the maintenance period. |
|
scheduled |
|
2017-08-07 15:23:35.0 |
|
IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
|
Planned Maintenance |
|
3050 |
|
1 |
|
2017-08-09 09:00:00.0 |
|
2017-08-09 11:00:00.0 |
|
Sentinel-3A |
|
ground-segment-maintenance |
|
data-delayed |
|
scheduled |
|
2017-08-02 10:31:56.0 |
|
OLCI Level 1 Products - S3A OLCI Level 2 Marine Products - S3A SLSTR Level 1 Products - S3A SLSTR Level 2 Marine Products - S3A SRAL Level 2 Marine Products - S3A SRAL L2P Marine Products - S3A SRAL Level 1 Products - S3A |
|
Planned Maintenance |
|
3015 |
|
1 |
|
2017-08-09 09:00:00.0 |
|
2017-08-10 15:00:00.0 |
|
ground-segment-maintenance |
|
data-unavailable |
|
New Meteosat MPEF (Meteorological Product Extraction Facility) release, for an update of the calibration coefficients for the visible channels (VIS-0.6, VIS-0.8, VIS-1.6, and HRVIS) of all three spacecraft. Additionally, the parameter identifiers in the OCA GRIB products will be modified. There will be a 2-hour down time followed by a 4-hour high risk period between 09:00 and 15:00 UTC on 9 August 2017 for the IODC service and the 9.5 degree RSS and on 10 August 2017 for the 0 degree service. For full details, see the URL provided below |
|
https://www.eumetsat.int/website/home/News/DAT_3559394.htm |
|
scheduled |
|
2017-07-13 08:29:53.0 |
|
0° Meteosat Meteorological Products IODC Meteosat Meteorological Products RSS Meteosat Meteorological Products |
|
Service Enhancement |
|
3051 |
|
1 |
|
2017-08-09 15:07:00.0 |
|
NOAA-18 |
|
all-instruments |
|
service-change |
|
Attitude Control Mode Change for Yaw, Roll, and Pitch to improve Attitude Pointing and instrument performance. Affecting AMSU-A, HIRS, MHS instrument data in the production of ATOVS products. During the implementation of the change there is a risk of service interruption. |
|
scheduled |
|
2017-08-02 14:41:37.0 |
|
EARS-ATOVS Global NOAA ATOVS L1 data |
|
Planned Maintenance |
|
3052 |
|
1 |
|
2017-08-09 18:50:00.0 |
|
2017-08-09 19:49:00.0 |
|
Metop-A |
|
GOME-2 |
|
instrument-calibration |
|
data-unavailable |
|
GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
|
scheduled |
|
2017-08-02 15:05:26.0 |
|
GOME-2 AHRPT Metop-A GOME-2 Level 1 - Metop-A AC SAF - Products |
|
Planned Maintenance |
|
3053 |
|
1 |
|
2017-08-09 19:44:00.0 |
|
2017-08-09 20:43:00.0 |
|
Metop-B |
|
GOME-2 |
|
instrument-calibration |
|
data-unavailable |
|
GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
|
scheduled |
|
2017-08-02 15:06:48.0 |
|
GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products |
|
EUMETSAT |
|
Eumetsat-Allee
1 D-64295 Darmstadt Germany |
|
+49 6151 807 3660/3770 |
|
+49 6151 807 3790 |
|
ops@eumetsat.int |
|
www.eumetsat.int |