Subject: in-plane-manoeuvre Impact: data-degraded Detail: Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. Status: scheduled Issue Time: 2017-11-08 15:44:42.0 Services: AVHRR Level 1 - Metop-A SEM L0 - Metop-A AMSU-A Level 1 - Metop-A MHS Level 1 - Metop-A ASCAT Level 1 - Metop-A IASI Level 1 - Metop-A HIRS Level 1 - Metop-A GRAS Level 1 - Metop-A GOME-2 Level 1 - Metop-A ATOVS Sounding products - Metop-A IASI Sounding Products - Metop-A ASCAT Soil Moisture - Metop-A Multi-Sensor Products - Metop-A AVHRR Polar Winds - Metop-A A-DCS AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A ASCAT AHRPT Metop-A HIRS AHRPT Metop-A IASI AHRPT Metop-A GOME-2 AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A SEM AHRPT Metop-A Type: Planned Maintenance Ann Nr: 3322 Rev: 2 Start Time: 2017-12-11 08:00:00.0 End Time: 2017-12-15 17:00:00.0