WWIO21 KNES 200856

A.  09S (FANELE)

B.  20/0830Z

C.  20.4S

D.  42.4E

E.  ONE/MET-7

F.  T6.0/6.0/D2.5/24HRS

G.  IR/EIR/VIS

H.  REMARKS...WMG EYE IS EMBEDDED IN B AND SURROUNDED BY B RESULTING IN
A DT OF 6.5 AFTER 1.0 IS ADDED AS AN EYE ADJUSTMENT. THIS AGREES WELL
WITH MANUALLY DERIVED ADT OUTPUT SHOWING RAW T NUMBERS OF 6.5 AT 0800Z
AND 0830Z.  MET IS 5.0 FOR RAPIDLY DEVELOPING SYSTEM WHILE PT IS 5.5.
AVERAGE RAW ADT T NUMBER OVER LAST 5 HOURS IS 6.0 AND THIS...ALONG WITH
CONSTRAINTS...FORMS THE BASIS OF THE FT. ~TURK

I.  ADDL POSITIONS

    NIL