TXPZ21 KNES 251827
TCSENP

A.  07E (GENEVIEVE)

B.  25/1800Z

C.  12.1N

D.  135.8W

E.  THREE/GOES-W

F.  T2.5/2.5/D1.0/24HRS

G.  IR/EIR/VIS/SSMI/SSMIS

H.  REMARKS...DETERMINED 2 DT NUMBERS USING SHEAR AND BANDING SCENE
TYPES.  SHEAR METHOD YIELDED DT OF 3.0 WITH LLCC .2 DEGREES AWAY FROM
THE CORE CONVECTION.  BANDING DT YIELDED A 2.5 BASED ON 4/10 BANDING.
WENT WITH BANDING METHOD FOR DT IN THE END DUE TO BANDING CONVECTION ON
THE SOUTHERN FLANK GIVING THE SYSTEM MORE BANDING FEATURES AND OVERALL
LOOK THAN SHEAR. MET IS 2.5 BASED ON 24HR DEVELOPMENT.  PT IS 2.5.
FT IS BASED ON DT.

I.  ADDL POSITIONS

    25/1205Z 12.0N 135.0W SSMI
    25/1348Z 12.0N 135.4W SSMIS


...LIDDICK