TXPQ25 KNES 231530 TCSWNP A. 09W (BAVI) B. 23/1430Z C. 27.0N D. 125.2E E. THREE/HIMAWARI-8 F. T3.5/4.5 G. IR/EIR/SWIR H. REMARKS...THIS INTENSITY ESTIMATE WAS DERIVED USING 4 KM IR DATA. 5/10 BANDING WAS MEASURED AROUND THE LLCC YIELDING A DT OF 2.5. THE MET AND PT ARE BOTH 3.0 AND THE FT IS BASED ON CONSTRAINTS LIMITING A CHANGE OF T-NO TO T1.0/6HRS. I. ADDL POSITIONS NIL ...MLEVINE