TXPQ22 KNES 051823 TCSWNP A. 12W (NONAME) B. 05/1700Z C. 30.1N D. 136.4E E. FIVE/HIMAWARI-8 F. T1.0/1.0 G. IR/EIR/SWIR H. REMARKS...THIS INTENSITY ESTIMATE WAS DERIVED USING 4 KM IR DATA. SYSTEM HAS LESS THAN 2/10 BANDING RESULTING IN A DT LESS THAN 1.0. THE 24 HR DEVELOPMENT TREND IS STEADY RESULTING MET TO BE 1.0 AND PT TO BE <1.0. FT IS BASED ON CONSTRAINTS DUE TO SYSTEM CANNOT BE WEAKENED IN THE FIRST 24 HRS OF INITIAL T1.0. I. ADDL POSITIONS NIL ...PATEL