TXPQ29 KNES 150631 TCSWNP A. 19W (CHANTHU) B. 15/0530Z C. 30.4N D. 125.5E E. THREE/HIMAWARI-8 F. T2.5/2.5 G. IR/EIR/VIS H. REMARKS...SYSTEM HAS 5/10 BANDING RESULTING IN A DT OF 2.5. THE 0545Z GMI 89 GHZ MW PASS REVEALS THE BANDING STRUCTURE NEAR THE SYSTEM LLCC. ADDITIONALLY, CONVECTION CAN BE SEEN CONTINUING TO BUILD AND A CDO LIKE FEATURE IS STARTING TO OCCUR OVER THE LLCC ON VISIBLE SATELLITE IMAGERY. THE 24 HR TREND IS DEVELOPING SLOWLY. MET AND PT ARE UNDEFINED DUE TO SYSTEM BEING SUBTROPICAL WITHIN THE LAST 24 HR HOURS. FT IS BASED ON DT. I. ADDL POSITIONS NIL ...PATEL