TXPQ29 KNES 160622 TCSWNP CCA A. 19W (CHANTHU) B. 15/2330Z C. 30.4N D. 125.0E E. THREE/HIMAWARI-8 F. T3.5/3.5 G. IR/EIR/VIS H. REMARKS...CORRECTED FOR REMARKS. THIS INTENSITY ESTIMATE WAS DERIVED USING 4 KM IR DATA. SYSTEM HAS 8/10 BANDING RESULTING IN A DT OF 3.5. THE BANDING STRUCTURE CAN ADDITIONALLY BE SEEN ON THE 2205Z SSMIS MW PASS WHICH MEASURED 8/10 IN BANDING. THE BANDING STRUCTURE IS ALSO WRAPPING INTO THE CORE OF THE SYSTEM WITH A HEALTHY OUTFLOW SEEN ON VISIBLE IMAGERY INDICATING A STRENGTHENING SYSTEM. THE 24 HR TREND IS DEVELOPING SLOWLY. MET AND PT ARE UNDEFINED DUE TO SYSTEM BEING SUBTROPICAL WITHIN THE LAST 24 HRS. FT IS BASED ON DT. I. ADDL POSITIONS NIL ...PATEL