Subject: Administrative: Reminder: GOES-15 (GOES-West) Sounder Patch --20cf303b39f98752b204c9add136 Content-Type: text/plain; charset=ISO-8859-1 ****CORRECTION in subject line and topic**** We are changing only the sounder patch temperature. Topic: GOES-15 (GOES-West) Sounder Patch Temperature Change is scheduled for September 14, 2012 Date/Time Issued: September 14, 2012 1842 UTC Product(s) or Data Impacted: no immediate effect to products other than unnoticeably higher noise levels Date/Time of Initial Impact: September 14, 2012 2045 UTC Date/Time of Expected End: See details. Length of Outage: N/A Details/Specifics of Change: Today, September 14, 2012, SOCC Engineers will change the GOES-15 (GOES-West) Sounder patch temperature from its LOW set point (82 K) to its HIGH set-point (88 K) during daily house-keeping period at about 2045 UTC. This is to prevent loss of patch control around each equinox due to dislocated cooler blanket (GIR: PSPOT-0005). The temperature transition is expected to take 30-60 minutes and may result in some striping during the transition, especially just after the command is sent at ~1700 UTC. The patch will be controlled at this temperature until after the upcoming Yaw Flip (September 20, 2012) and changed back to "LOW" again on October 23, 2012. We will be staying at "HIGH" setting a bit longer to assure faster cooling (less product impact) when the sun is further south. Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov at 301-817-3880 Web Site(s) for applicable information: See http://www.ssd.noaa.gov/PS/SATS/messages.html for this and other satellite related messages. This message was sent to ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note: it may take up to two business days to process your unsubscribe request. --20cf303b39f98752b204c9add136 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: quoted-printable
****CORRECTION in subject line and topic**** We are changing only the = sounder patch temperature.

Topic: GOES-15 (GOES-We= st) Sounder Patch Temperature Change is scheduled for September 14, 2012

Date/Time Issued: September 14, 2012 1842 UTC

Product(s) or Data Impacted: no immediate effect to product= s other than unnoticeably higher noise levels

Date/Time of Initial Impact: September 14, 2012 2045 UTC

Date/Time of Expected End: See details.

Len= gth of Outage: N/A

Details/Specifics of Change: To= day, September 14, 2012, SOCC Engineers will change the GOES-15 (GOES-West)= Sounder patch temperature from its LOW set point (82 K) to its HIGH set-po= int (88 K) during daily house-keeping period at about 2045 UTC. This is to = prevent loss of patch control around each equinox due to dislocated cooler = blanket (GIR: PSPOT-0005).

The temperature transition is expected to take 30-60 mi= nutes and may result in some striping during the transition, especially jus= t after the command is sent at ~1700 UTC. The patch will be controlled at t= his temperature until after the upcoming Yaw Flip (September 20, 2012) and = changed back to "LOW" again on October 23, 2012. We will be stayi= ng at "HIGH" setting a bit longer to assure faster cooling (less = product impact) when the sun is further south.

Contact Information for Further Information: ESPC Opera= tions at ESPCOperations@noaa.gov= at 301-817-3880

Web Site(s) for applicable in= formation:
See http://w= ww.ssd.noaa.gov/PS/SATS/messages.html for this and other satellite rela= ted messages.

This message was sent to ESPC.Notification@noaa.gov. You have= been sent this and other notifications because you have opted in to receiv= e it. If for any reason, you wish to unsubscribe, please contact ESPC Help = Desk at ESPCOperations@noaa.gov<= /a> or (301) 817-3880. Please note: it may take up to two business days to = process your unsubscribe request.

--20cf303b39f98752b204c9add136--