Subject: Administrative: Update #1:Scheduled 5 minute data delay This is a multi-part message in MIME format. --------------030507000405080309070508 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Update #1*:The rack move scheduled for Friday, January 25th has been postponed til Monday, February 4th. *Topic:* Scheduled data outage for Metop-A, Metop-B, Jason-2, Meteosat-10 on January 25, 2013 *Date/Time Issued:* January 24, 2013 1845 UTC *Product(s) or Data Impacted:* Metop-A, Metop-B, Jason-2, Meteosat-10 Imager and Sounder Data, and Derived Products that rely on data from these satellites *Date/Time of Initial Impact:* January 25, 2013 _time TBD_ *Date/Time of Expected End:* January 25, 2013 _time TBD_ *Length of Data Outage:* 4 hours *Details/Specifics of Change:* EUMETSAT will need to perform rack (39 & 40) moves over in Darmstadt by the COB of Friday, January 25, 2013. There are two (2) COMM lines that will need to be moved. The 1st line is data (MetOp, BGAC, Jason-2) that goes to NSOF. This line is hardwired link, which will require re-splicing in order to move the IJPS and Jason racks. It is projected that the line will be down for about 4 hrs. The 2nd line is the WCDA CIP line that handles BGAC, MetOp and Met-10 data between Wallops, VA. This line can be moved without contractor support, which means the down time should be limited. A notification will be distributed later with additional details on this data outage. *Contact Information for Further Information:* ESPC Operations at ESPCOperations@noaa.gov at 301-817-3880 *Web Site(s) for applicable information:* See http://www.ssd.noaa.gov/PS/SATS/messages.html for this and other satellite related messages. This message was sent to ESPC.Notification@noaa.gov . You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk atESPCOperations@noaa.gov or (301) 817-3880 . Please note: it may take up to two business days to process your unsubscribe request. --------------030507000405080309070508 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit Update #1:The rack move scheduled for Friday, January 25th has been postponed til Monday, February 4th. 

Topic: Scheduled data outage for Metop-A, Metop-B, Jason-2, Meteosat-10 on January 25, 2013

Date/Time Issued: January 24, 2013  1845 UTC

Product(s) or Data Impacted: Metop-A, Metop-B, Jason-2, Meteosat-10 Imager and Sounder Data, and Derived Products that rely on data from these satellites

Date/Time of Initial Impact: January 25, 2013 time TBD

Date/Time of Expected End: January 25, 2013 time TBD

Length of Data Outage:  4 hours

Details/Specifics of Change:  EUMETSAT will need to perform rack (39 & 40)  moves over in Darmstadt by the COB of Friday, January 25, 2013.  There are two (2) COMM lines that will need to be moved.  The 1st line is data (MetOp, BGAC, Jason-2) that goes to NSOF.  This line is hardwired link, which will require re-splicing in order to move the IJPS and Jason racks.  It is projected that the line will be down for about 4 hrs.

The 2nd line is the WCDA CIP line that handles BGAC, MetOp and Met-10 data between Wallops, VA.  This line can be moved without contractor support, which means the down time should be limited.  A notification will be distributed later with additional details on this data outage. 

Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov at 301-817-3880

Web Site(s) for applicable information:
See http://www.ssd.noaa.gov/PS/SATS/messages.html for this and other satellite related messages.

This message was sent to ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it.  If for any reason, you wish to unsubscribe, please contact ESPC Help Desk atESPCOperations@noaa.gov or (301) 817-3880. Please note: it may take up to two business days to process your unsubscribe request.

--------------030507000405080309070508--