Subject: Administrative: EMWIN on LRIT Outage Notification, Issued: This is a multi-part message in MIME format. --------------020304080006070106020906 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Topic:* Notification of Planned EMWIN on LRIT Outage Due to an ESPC CIP Exercise. LRIT imagery and the copy the GOES Data Collection Service will be available during the outage. The only affected part of the LRIT broadcast will be the loss of the copy of EMWIN. *Date/Time Issued:* April 15, 2013: 1925 UTC *Date/Time of Initial Impact:* April 16, 2013: 8:30 local (1230 UTC) *Date/Time of Expected End:* April 16, 2013: 2:00 local (1800 UTC) *Length of Event*: ~ 6 hrs *Product(s) or Data Impacted:* The copy of EMWIN on LRIT East and LRIT West. *Details/Specifics of Change: * The ESPC plans to failover to the Critical Infrastructure Protection (CIP) site on April 16th in support of ESPC CIP Testing. Currently, there is no connection from the NWS EMWIN system into the CIP facility. NOAA is working to facilitate this connection in the near future. The purpose of the exercise is to validate the ability to failover the ESPC network to the CIP system and the ability to switchback the ESPC network to the NSOF facility after an approximately six (6) hour duration. The Facility Backup Exercise will begin at 8:30am EST and products should begin distributing from the CIP system by 9:00am EST. The CIP site, at Wallops Island, VA will be the operational ESPC system for a total of eight (8) hours. Network Failover to ESPC/CIP: 1 hour Product Distribution/Network Sustainability: 6 hours Network switchback to ESPC/NSOF: 1 hour During the Failover Test, normal problem reporting can be performed utilizing the ESPC Help Desk, at 301-817-3880. *Contact Information for Further Information:* ESPC Operations at ESPCOperations@noaa.gov and 301-817-3880 --------------020304080006070106020906 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit
Topic:  Notification of Planned EMWIN on LRIT Outage Due to an ESPC CIP Exercise. 

LRIT imagery and the copy the GOES Data Collection Service will be available during the outage. The only affected part of the LRIT broadcast will be the loss of the copy of EMWIN.

Date/Time Issued: April 15, 2013: 1925  UTC

Date/Time of Initial Impact: April 16, 2013: 8:30 local (1230 UTC)

Date/Time of Expected End:  April 16, 2013: 2:00 local (1800 UTC)

Length of Event: ~ 6 hrs

Product(s) or Data Impacted:  The copy of EMWIN on LRIT East and LRIT West.

Details/Specifics of Change:  The ESPC plans to failover to the Critical Infrastructure Protection (CIP) site on April 16th in support of ESPC CIP Testing. Currently, there is no connection from the NWS EMWIN system into the CIP facility. NOAA is working to facilitate this connection in the near future.

The purpose of the exercise is to validate the ability to failover the ESPC network to the CIP system and the ability to switchback the ESPC network to the NSOF facility after an approximately six  (6) hour duration.  

The Facility Backup Exercise will begin at 8:30am EST and products should begin distributing from the CIP system by 9:00am EST.

The CIP site, at Wallops Island, VA will be the operational ESPC system for a total of eight (8) hours. 
Network Failover to ESPC/CIP:                              1 hour
Product Distribution/Network Sustainability:          6 hours
Network switchback to ESPC/NSOF:                    1 hour
During the Failover Test, normal problem reporting can be performed utilizing the ESPC Help Desk, at 301-817-3880.

Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov and 301-817-3880