Subject: Administrative:Notification of GOES Data Collection Service This is a multi-part message in MIME format. --------------020402010807060303070707 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Topic*: Notification of GOES Data Collection Service on LRIT Outage Due to an ESPC CIP Exercise. LRIT imagery will be available during the outage. The affected part of the LRIT broadcast will be the loss of the copy of EMWIN and the copy of GOES Data Collection Service (GOES-DCS). *Date/Time Issued:* April 15, 2013: 1455 UTC *Date/Time of Initial Impact*: April 16, 2013: 8:30 local (1230 UTC) *Date/Time of Expected End:* April 16, 2013: 2:00 local (1900 UTC) *Length of Event:* ~ 6.5 hrs *Product(s) or Data Impacted*: The copy of EMWIN and the copy of GOES DCS on LRIT East and LRIT West. *Details/Specifics of Change:* The ESPC has failed over to the Critical Infrastructure Protection (CIP) site on April 16th in support of ESPC CIP Testing. Currently, there is no connection from the NWS EMWIN system or the GOES DCS system into the CIP facility. NOAA is working to restore the DCS connection as soon as possible. The EMWIN connection will not be available until the end of the exercize. The purpose of the exercise is to validate the ability to failover the ESPC network to the CIP system and the ability to switchback the ESPC network to the NSOF facility after an approximately six (6) hour duration. The Facility Backup Exercise will begin at 8:30am EST and products should begin distributing from the CIP system by 9:00am EST. The CIP site, at Wallops Island, VA will be the operational ESPC system for a total of eight (8) hours. Network Failover to ESPC/CIP: 1 hour Product Distribution/Network Sustainability: 6 hours Network switchback to ESPC/NSOF: 1 hour During the Failover Test, normal problem reporting can be performed utilizing the ESPC Help Desk, at 301-817-3880 . Paul Seymour Direct Broadcast Manager 301-817-4521 Paul.Seymour@NOAA.Gov --------------020402010807060303070707 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit
Topic

LRIT imagery will be available during the outage. The affected part of the LRIT broadcast will be the loss of the copy of EMWIN and the copy of GOES Data Collection Service (GOES-DCS).

Date/Ti Issued: April 15, 2013: 1455  UTC

Date/Ti of Initial Impact: April 16, 2013: 8:30 local (1230 UTC)

Date/Ti of Expected End:  April 16, 2013: 2:00 local (1900 UTC)

Length of Event: ~ 6.5 hrs

Product or Data Impacted:  The copy of EMWIN and the copy of GOES DCS on LRIT East and LRIT West.

Details of Change:  The ESPC has failed over to the Critical Infrastructure Protection (CIP) site on April 16th in support of ESPC CIP Testing. Currently, there is no connection from the NWS EMWIN system or the GOES DCS system into the CIP facility. 

NOAA is working to restore the DCS connection as soon as possible. The EMWIN connection will not be available until the end of the exercize.

The purpose of the exercise is to validate the ability to failover the ESPC network to the CIP system and the ability to switchback the ESPC network to the NSOF facility after an approximately six  (6) hour duration.  

The Facility Backup Exercise will begin at 8:30am EST and products should begin distributing from the CIP system by 9:00am EST.

The CIP site, at Wallops Island, VA will be the operational ESPC system for a total of eight (8) hours. 
Network Failover to ESPC/CIP:                              1 hour
Product Distribution/Network Sustainability:          6 hours
Network switchback to ESPC/NSOF:                    1 hour
During the Failover Test, normal problem reporting can be performed utilizing the ESPC Help Desk, at 301-817-3880.

Paul Seymour
Direct Broadcast Manager
301-817-4521