Subject: Administrative: EUMETSAT Weekly Operations Schedule, Issued: Weekly Operations Schedule Issued on 04/07/13 at 14:05:25 Seq Nr: 1 Planned activities for week 28/2013: GENERIC SERVICE INFORMATION The EUMETCast Europe service will be upgraded from DVB-S to the DVB-S2 standard in August 2014. For detailed information, please see http://www.eumetsat.int/website/home/DataNewsletter/EUMETCast/DAT_2043191.html METEOSAT 0 DEG SERVICE 01 July 2013 08:00 UTC - 09 July 2013 09:15 UTC Meteosat-10 SEVIRI decontamination During this timeframe, Meteosat-8 image data and meteorological products will be provided in place of those from Meteosat-10. The data will be rectified to 0 degree. An outage of 30 minutes is to be expected when switching to and from Meteosat-8. For full details, please see: http://www.eumetsat.int/website/home/News/DAT_2045911.html METOP AND NOAA GLOBAL DATA SERVICE 10 July 2013 12:06 - 12:54 UTC Metop-B IASI on-board parameter update Data will be unavailable for about one hour. METOP AHRPT DIRECT READOUT For current information please see: http://oiswww.eumetsat.org/UNS/webapps/showData.do?type=17 S-NPP PROVISIONAL DATA 09 July 2013 13:00 UTC - 10 July 2013 13:00 UTC Connection testing with NOAA's NPP Data Exploitation ground segment. During this time there is a risk of outage for global NPP products. FUTURE EVENTS METOP AND NOAA GLOBAL DATA SERVICE 15 July 2013 GOME-2 instruments on Metop-A and Metop-B: Start of GOME-2 tandem operations phase. 1) GOME-2 on Metop-A: Switch of nominal swath width to 960 km. This will reduce the ground pixel sizes for measurements at nominal integration times of 0.1875 to 40 by 40 km. Polarisation device measurements (PMD) ground pixel sizes will be reduced to 40 by 5 km. 2) GOME-2 on Metop-A: The monthly narrow swath scanning period will be replaced with one day of scanning using a 320 km swath. 3) GOME-2 on Metop-B: Nominal scanning will be unaffected (1920 km swath). 4) GOME-2 on Metop-B: The monthly narrow scanning sequence will be removed from the 29 days repeat cycle. For details on the 29 days on-board timeline sequence for both instruments, please refer to: http://oiswww.eumetsat.org/epsreports/html/tl.php?sat=M01 http://oiswww.eumetsat.org/epsreports/html/tl.php?sat=M02 17 July 2013 IASI Level 2 Sounding Products available on EUMETCast Africa and moving from channel EPS-11 to EPS-Africa Users in the Ku-band footprint already receiving these products should ensure they update their station setup to be able to continue receiving the products. For full details, please see: http://www.eumetsat.int/website/home/News/DAT_2055486.html 18 July 2013 ATOVS Level 2 products from Metop-B available on EUMETCast For full details, please see: http://www.eumetsat.int/website/home/News/DAT_2047683.html SAF Products 15 July 2013 The following O3M SAF products from Metop-B will be available on EUMETCast: - NRT Absorbing Aerosol Index (NAR) - Near Real Time Ozone Profiles (NOP) - Near Real Time Total Column (NTO) For full details, please see: http://www.eumetsat.int/website/home/News/DAT_2055950.html INFORMATION: For further information, please contact the EUMETSAT User Services Helpdesk Tel: +49 6151 807 366 Fax: +49 6151 807 379 Email: ops@eumetsat.int www.eumetsat.int