Subject: Administrative: METOP_M02_ADMIN, Issued: September 02, This is a multi-part message in MIME format. --------------080307090805010202050203 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Topic: *METOP M02 ADMIN *Date/Time**Issued:* September 02, 2013 1920 UTC *Product(s) or Data Impacted:*METOP *Date/Time of Initial Impact:*September 02, 2013 19:03:25 *Date/Time of Expected End:*See table in detail for on and off switch times ** *Length of Outage:*N/A *Details/Specifics of Change:* ETOP M02 ADMIN 2013/09/02 19:03:25 Seq Nr: 1 Message Nr: 18 ** Metop-A status: A-DCS/2: Nominal AMSUA: Nominal Channel 3 and 7 exceed noise specifications. ASCAT: Nominal AVHRR: Nominal GRAS: Nominal GOME: Nominal HIRS: Nominal IASI: Nominal MHS: Nominal S&R: Nominal SEM: Nominal ** Direct readout status: LRPT: Off A-HRPT: Regional service transmission schedule for each orbit. ** A-HRPT scheduled activities: Satellite,Orbit,Switch ON,Switch OFF Metop-A,35665,2013-09-03 01:57:08,2013-09-03 02:03:57,A Metop-A,35665,2013-09-03 02:34:41,2013-09-03 02:53:08,D Metop-A,35665,2013-09-03 03:36:25,2013-09-03 03:45:18,A Metop-A,35666,2013-09-03 04:15:48,2013-09-03 04:38:47,D Metop-A,35666,2013-09-03 05:15:41,2013-09-03 05:26:40,A Metop-A,35667,2013-09-03 05:55:42,2013-09-03 06:20:09,D Metop-A,35667,2013-09-03 06:48:33,2013-09-03 07:09:13,A Metop-A,35668,2013-09-03 07:34:30,2013-09-03 07:54:06,D Metop-A,35668,2013-09-03 08:31:18,2013-09-03 08:52:07,A Metop-A,35669,2013-09-03 09:14:19,2013-09-03 09:31:08,D Metop-A,35669,2013-09-03 10:14:01,2013-09-03 10:33:36,A Metop-A,35670,2013-09-03 10:55:41,2013-09-03 11:09:58,D Metop-A,35670,2013-09-03 11:56:30,2013-09-03 12:14:57,A Metop-A,35671,2013-09-03 12:37:50,2013-09-03 12:51:06,D Metop-A,35671,2013-09-03 13:37:52,2013-09-03 13:56:19,A Metop-A,35672,2013-09-03 14:24:12,2013-09-03 14:34:33,D Metop-A,35672,2013-09-03 15:19:13,2013-09-03 15:37:41,A Metop-A,35673,2013-09-03 16:05:34,2013-09-03 16:18:19,D Metop-A,35673,2013-09-03 17:00:35,2013-09-03 17:19:02,A Metop-A,35674,2013-09-03 17:46:55,2013-09-03 18:09:03,D Metop-A,35674,2013-09-03 18:37:39,2013-09-03 19:00:24,A A single burn in-plane manoeuvre is confirmed for 2013-09-04. Burn 1: 13:36:41 duration 3.43 seconds (duration=0 means no burn) Scheduled instrument activities during the manoeuvre are;- GOME: The mirror will be placed in launch position from 2013-09-04 13:35:00 to 2013-09-04 15:16:00 SEM :the manoeuvre mode between 2013-09-04 08:40:00 and 2013-09-04 14:28:00 followed by TED and IFC. Reduced product quality of all products should be expected for data sensed during this period. Expected post-manoeuvre TLE: 1 29499U 06044A 13247.57065083 .00000000 00000+0 56209-4 0 00017 2 29499 98.7056 306.2120 0001053 164.9653 258.2442 14.21481063356862 ** Please note: ASCAT Extensive calibration campaign between 2013-08-27 and 2013-11-05. Interruptions can be expected over Turkey during this period. *Contact Information for Further Information:* ESPC Operations atESPCOperations@noaa.gov and301-817-3880 . *Web Site(s) for applicable information:*N/A This message was sent by ESPC.Notification@noaa.gov . You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880 . Please note: it may take up to two business days to process your unsubscribe request. ** ** --------------080307090805010202050203 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit Topic:  METOP M02 ADMIN

Date/Time Issued:  September 02, 2013 1920  UTC

Product(s) or Data Impacted:  METOP

Date/Time of Initial Impact: September 02, 2013  19:03:25

Date/Time of Expected End:  See table in detail for on and off switch times

Length of Outage:  N/A

Details/Specifics of Change:

ETOP M02 ADMIN

2013/09/02 19:03:25

Seq Nr: 1
Message Nr: 18

** Metop-A status:
A-DCS/2: Nominal
AMSUA: Nominal Channel 3 and 7 exceed noise specifications.
ASCAT: Nominal
AVHRR: Nominal
GRAS: Nominal
GOME: Nominal
HIRS: Nominal
IASI: Nominal
MHS: Nominal
S&R: Nominal
SEM: Nominal
** Direct readout status:
LRPT: Off
A-HRPT: Regional service transmission schedule for each orbit.
** A-HRPT scheduled activities:
Satellite,Orbit,Switch ON,Switch OFF
Metop-A,35665,2013-09-03 01:57:08,2013-09-03 02:03:57,A
Metop-A,35665,2013-09-03 02:34:41,2013-09-03 02:53:08,D
Metop-A,35665,2013-09-03 03:36:25,2013-09-03 03:45:18,A
Metop-A,35666,2013-09-03 04:15:48,2013-09-03 04:38:47,D
Metop-A,35666,2013-09-03 05:15:41,2013-09-03 05:26:40,A
Metop-A,35667,2013-09-03 05:55:42,2013-09-03 06:20:09,D
Metop-A,35667,2013-09-03 06:48:33,2013-09-03 07:09:13,A
Metop-A,35668,2013-09-03 07:34:30,2013-09-03 07:54:06,D
Metop-A,35668,2013-09-03 08:31:18,2013-09-03 08:52:07,A
Metop-A,35669,2013-09-03 09:14:19,2013-09-03 09:31:08,D
Metop-A,35669,2013-09-03 10:14:01,2013-09-03 10:33:36,A
Metop-A,35670,2013-09-03 10:55:41,2013-09-03 11:09:58,D
Metop-A,35670,2013-09-03 11:56:30,2013-09-03 12:14:57,A
Metop-A,35671,2013-09-03 12:37:50,2013-09-03 12:51:06,D
Metop-A,35671,2013-09-03 13:37:52,2013-09-03 13:56:19,A
Metop-A,35672,2013-09-03 14:24:12,2013-09-03 14:34:33,D
Metop-A,35672,2013-09-03 15:19:13,2013-09-03 15:37:41,A
Metop-A,35673,2013-09-03 16:05:34,2013-09-03 16:18:19,D
Metop-A,35673,2013-09-03 17:00:35,2013-09-03 17:19:02,A
Metop-A,35674,2013-09-03 17:46:55,2013-09-03 18:09:03,D
Metop-A,35674,2013-09-03 18:37:39,2013-09-03 19:00:24,A
A single burn in-plane manoeuvre is confirmed for 2013-09-04.
Burn 1: 13:36:41 duration 3.43 seconds (duration=0 means no burn)
Scheduled instrument activities during the manoeuvre are;-
GOME: The mirror will be placed in launch position from 2013-09-04
13:35:00 to 2013-09-04 15:16:00
SEM :the manoeuvre mode between 2013-09-04 08:40:00 and 2013-09-04
14:28:00 followed by TED and IFC.
Reduced product quality of all products should be expected for data
sensed during this period.
Expected post-manoeuvre TLE:
1 29499U 06044A   13247.57065083  .00000000  00000+0  56209-4 0 00017
2 29499  98.7056 306.2120 0001053 164.9653 258.2442 14.21481063356862
** Please note:
ASCAT Extensive calibration campaign between 2013-08-27 and
2013-11-05. Interruptions can be expected over Turkey during this
period.




Contact Information
	  for Further  Information: ESPC Operations at ESPCOperations@noaa.gov
      and 301-817-3880.    

Web Site(s) for applicable information: N/A

This message was sent by ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note: it may take up to two business days to process your unsubscribe request.

 



--------------080307090805010202050203--