Subject: Administrative: Weekly_Operations_Schedule, Issued: This is a multi-part message in MIME format. --------------000309040804020300040108 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Topic: *Weekly_Operations_Schedule *Date/Time**Issued:*September 12, 2013 1409 UTC *Product(s) or Data Impacted:*METOP** *Date/Time of Initial Impact:*September 12*,*, 2013 13:30:34 UTC ** *Date/Time of Expected End:*See table in detail for on and off switch times ** *Length of Outage:*N/A *Details/Specifics of Change:* Weekly Operations Schedule Issued on 12/09/13 at 13:30:34 Seq Nr: 1 Planned activities for week 38/2013: GENERIC SERVICE INFORMATION The EUMETCast Europe service will be upgraded from DVB-S to the DVB-S2 standard in August 2014. For detailed information, please seehttp://www.eumetsat.int/website/home/DataNewsletter/EUMETCast/DAT_2043191.html Meteosat Straylight. During eclipse seasons, stray light affects the way the spacecraft instrument is commanded. There are periods where the black body calibration is performed after the instrument retrace instead of prior to it. This delays files for the time of the calibration (approximately three minutes) which then affects the data timeliness in the same way. This nominal calibration activity during eclipse seasons will therefore cause periods of noticeable delays to reception of data by Users. Meteosat Straylight Predictions for Autumn/Winter 2013 are available on EUMETSAT Website: http://www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en (See Section "Straylight Predictions (XML)") METEOSAT 0 DEG SERVICE 18 September 2013 Essential ground segment maintenance: - For the Atmospheric Motion Vector (AMV) product from Meteosat-10, the inversion height assignment for the WV channel AMVs will be disabled. Due to this maintenance, there will be an outage of the Meteosat-10 meteorological product generation from 08:15 UTC to 09:15 UTC, followed by a high risk period of two hours. METEOSAT RSS 17 September 2013 09:00 UTC - 19 September 2013 09:00 UTC Monthly RSS interruption Meteosat-9 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment Maintenance. Meteosat-8 RSS image data, rectified to 9.5 deg E, replaces the Meteosat-9 service. The RSS meteorological product service is not available during this timeframe. METEOSAT IODC 03 August 2013 - 29 September 2013 Meteosat-7 Autumn 2013 eclipse season Slots 37 to 43 may not be available. 12 September 2013 - 24 September 2013 Meteosat-7 Sun Co-linearity Slot 16 and 17 may be interrupted or unavailable. METOP AND NOAA GLOBAL DATA SERVICE 16 September 2013 - 18:57 UTC (Metop-A) Reset of the satellite onboard clock time. Due to the reset of METOP's onboard clock, the OBT_UTC coefficient within the admin message sent from the spacecraft to ground will be invalid between 18:57 & 19:50 UTC (approx). Therefore, there is a risk of interruption of EARS Svalbard products (Metop-A ATOVS, AVHRR, IASI and ASCAT) from the Fast Dump Extract System (FDES). 16 September 2013 Metop-A IASI L1 Auxiliary files Update A short outage of all IASI L1 products can be expected. 18 September 2013 18:55 - 19:55 UTC (Metop-A) 19:45 - 21:26 UTC (Metop-B) GOME-2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). Near real-time products from O3M SAF (L2 NTO) will be affected (see SAF PRODUCTS below). METOP AHRPT DIRECT READOUT For current information please see:http://oiswww.eumetsat.org/UNS/webapps/showData.do?type=17 SAF PRODUCTS 18 September 2013 18:55 - 19:55 UTC (Metop-A) 18 September 2013 19:45 - 21:26 UTC (Metop-B) GOME-2 operations (see above), O3M SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. THIRD-PARTY DATA AND PRODUCTS 17 August 2013 - 23 October 2013 MTSAT-2 Eclipse Operations The 14:00 and 15:00 images may not be available. FUTURE EVENTS METOP AND NOAA GLOBAL DATA SERVICE 26 September 2013 Metop-B IASI L1 Auxiliary files Update A short outage of all IASI L1 products can be expected. METOP AHRPT DIRECT READOUT 09 October 2013 12:00 UTC The current Admin Message via Metop-A HRPT will be discontinued and replaced with the Multi-Mission Administrative Message (MMAM), already being used operationally with Metop-B. INFORMATION: For further information, please contact the EUMETSAT User Services Helpdesk Tel: +49 6151 807 366 Fax: +49 6151 807 379 Email:ops@eumetsat.int www.eumetsat.int * * *Contact Information for Further Information**:*ESPC Operations at ESPCOperations@noaa.gov and 301-817-3880 *Web Site(s) for applicable information:*Email: ops@eumetsat.int www.eumetsat.int This message was sent by ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note: it may take up to two business days to process your unsubscribe request. ** ** --------------000309040804020300040108 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit Topic: Weekly_Operations_Schedule

Date/Time Issued: September 12,  2013   1409 UTC

Product(s) or Data Impacted:  METOP

Date/Time of Initial Impact:  September 12,,  2013  13:30:34  UTC

Date/Time of Expected End:  See table in detail for on and off switch times

Length of Outage:  N/A

Details/Specifics of Change:

Weekly Operations Schedule

Issued on 12/09/13 at 13:30:34

Seq Nr: 1

Planned activities for week 38/2013:

GENERIC SERVICE INFORMATION
The EUMETCast Europe service will be upgraded from DVB-S to the DVB-S2
standard in August 2014.
For detailed information, please see http://www.eumetsat.int/website/home/DataNewsl

Meteosat Straylight.
During eclipse seasons, stray light affects the way the spacecraft
instrument is commanded.  There are periods where the black body
calibration is performed after the instrument retrace instead
of prior to it. This delays files for the time of the calibration
(approximately three minutes) which then affects the data timeliness
in the same way.
This nominal calibration activity during eclipse seasons will therefore
cause periods of noticeable delays to reception of data by Users.
Meteosat Straylight Predictions for Autumn/Winter 2013	are available
on EUMETSAT Website:
http://www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en
(See Section "Straylight Predictions (XML)")


METEOSAT 0 DEG	SERVICE
18 September 2013
Essential ground segment maintenance:
  - For the Atmospheric Motion Vector (AMV) product from Meteosat-10,
  the inversion height assignment for the WV channel AMVs will be
  disabled.
Due to this maintenance, there will be an outage of the Meteosat-10
meteorological product generation from 08:15 UTC to 09:15 UTC,
followed by a high risk period of two hours.


METEOSAT RSS
17 September 2013  09:00 UTC - 19 September 2013  09:00 UTC
Monthly RSS interruption
Meteosat-9 Rapid Scanning Service (RSS) will be suspended for scheduled
Full Earth Scanning and Ground Segment Maintenance.
Meteosat-8 RSS image data, rectified to 9.5 deg E, replaces the
Meteosat-9 service. The RSS meteorological product service is not
available during this timeframe.


METEOSAT IODC
03 August 2013 - 29 September 2013
Meteosat-7 Autumn 2013 eclipse season
Slots 37 to 43 may not be available.

12 September 2013 - 24 September 2013
Meteosat-7 Sun Co-linearity
Slot 16 and 17 may be interrupted or unavailable.


METOP AND NOAA GLOBAL DATA SERVICE
16 September 2013 - 18:57 UTC (Metop-A)
Reset of the satellite onboard clock time.
Due to the reset of METOP's onboard clock, the OBT_UTC coefficient
within the admin message sent from the spacecraft to ground will be
invalid between 18:57 & 19:50 UTC (approx). Therefore, there is a
risk of interruption of EARS Svalbard products (Metop-A ATOVS, AVHRR,
IASI and ASCAT) from the Fast Dump Extract System (FDES).

16 September 2013
Metop-A IASI L1 Auxiliary files Update
A short outage of all IASI L1 products can be expected.


18 September 2013
18:55 - 19:55 UTC (Metop-A)
19:45 - 21:26 UTC (Metop-B)
GOME-2 monthly measurements of GOME-2 polarisation (PMD) data in raw
readout mode (PMDRAW).
Near real-time products from O3M SAF (L2 NTO) will be affected (see
SAF PRODUCTS below).


METOP AHRPT DIRECT READOUT
For current information please see: http://oiswww.eumetsat.org/UNS/webapps/showData.do?type=17

SAF PRODUCTS
18 September 2013  18:55 - 19:55 UTC (Metop-A)
18 September 2013  19:45 - 21:26 UTC (Metop-B)
GOME-2 operations (see above),
O3M SAF Near Real Time Total Column products (Total Column Ozone,
the Total Column NO2, and the Tropospheric NO2) will be unavailable.


THIRD-PARTY DATA AND PRODUCTS
17 August 2013 - 23 October 2013
MTSAT-2 Eclipse Operations
The 14:00 and 15:00 images may not be available.


FUTURE EVENTS
METOP AND NOAA GLOBAL DATA SERVICE
26 September 2013
Metop-B IASI L1 Auxiliary files Update
A short outage of all IASI L1 products can be expected.


METOP AHRPT DIRECT READOUT
09 October 2013 12:00 UTC
The current Admin Message via Metop-A HRPT will be discontinued
and replaced with the Multi-Mission Administrative Message (MMAM),
already being used operationally with Metop-B.



INFORMATION:
For further information, please contact the EUMETSAT User Services
Helpdesk
Tel: +49 6151 807 366
Fax: +49 6151 807 379
Email: ops@eumetsat.int
www.eumetsat.int


Contact Information for Further Information:ESPC Operations at ESPCOperations@noaa.gov and 301-817-3880

Web Site(s) for applicable information: Email: ops@eumetsat.int   www.eumetsat.int

This message was sent by ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note: it may take up to two business days to process your unsubscribe request.



--------------000309040804020300040108--