Subject: Administrative: Eumetsat Weekly Operations Schedule Issued: This is a multi-part message in MIME format. --------------090606060909050801090708 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Topic: *Eumetsat Weekly Operations Schedule *Date/Time Issued**:*September 20, 2013 0324 UTC* * *Product(s) or Data Impacted:*See list below. ** *Date/Time of Initial Impact:* September 20, 2013 06:16:29 UTC (from theEumetsat Weekly Operations Schedule message) ** *Date/Time of Expected End:***See table in detail for on and off switch time****** *Length of Outage:*N/A* * *Details/Specifics of Change: * Weekly Operations Schedule Issued on 20/09/13 at 06:16:29 Seq Nr: 1 Planned activities for week 39/2013: GENERIC SERVICE INFORMATION The EUMETCast Europe service will be upgraded from DVB-S to the DVB-S2 standard in August 2014. For detailed information, please seehttp://www.eumetsat.int/website/home/DataNewsletter/EUMETCast/DAT_2043191.html Meteosat Straylight. During eclipse seasons, stray light affects the way the spacecraft instrument is commanded. There are periods where the black body calibration is performed after the instrument retrace instead of prior to it. This delays files for the time of the calibration (approximately three minutes) which then affects the data timeliness in the same way. This nominal calibration activity during eclipse seasons will therefore cause periods of noticeable delays to reception of data by Users. Meteosat Straylight Predictions for Autumn/Winter 2013 are available on EUMETSAT Website: http://www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en (See Section "Straylight Predictions (XML)") METEOSAT 0 DEG SERVICE 25 September 2013 13:10 UTC - 24 September 2013 02:00 UTC Co-alignment of the two sun sensor slits on-board Meteosat-10 Risk of degraded image quality during this time period. The following services may be affected: SEVIRI High Rate Meteosat-10 SEVIRI Low Rate Meteosat-10 Meteorological Products Meteosat-10 METEOSAT RSS 23 September 2013 10:00 UTC - 24 September 2013 13:02 UTC Co-alignment of the two sun sensor slits on-board Meteosat-9 Risk of degraded image quality during this time period. The following services may be affected: SEVIRI High Rate Meteosat-9 Meteorological Products Meteosat-9 METEOSAT IODC 03 August 2013 - 29 September 2013 Meteosat-7 Autumn 2013 eclipse season Slots 37 to 43 may not be available. 12 September 2013 - 24 September 2013 Meteosat-7 Sun Co-linearity Slot 16 and 17 may be interrupted or unavailable. 25 September 2013 - 02:58 UTC Meteosat-7 East West Station Keeping Manoeuvre Users may observe degraded image quality for up to 6 hours following the manoeuvre. METOP AND NOAA GLOBAL DATA SERVICE 23 September 2013 08:27 UTC orbit 5266 Metop-B - ASCAT Gain Compression A short outage of all ASCAT products can be expected. 26 September 2013 Metop-B IASI L1 Auxiliary files Update A short outage of all IASI L1 products can be expected. 29 September 2013 05:12 - 09:12 UTC Metop-B - IASI External Calibration IASI GDS Level 1C and Level 2 products will not be available. METOP AHRPT DIRECT READOUT For current information please see:http://oiswww.eumetsat.org/UNS/webapps/showData.do?type=17 THIRD-PARTY DATA AND PRODUCTS 17 August 2013 - 23 October 2013 MTSAT-2 Eclipse Operations The 14:00 and 15:00 images may not be available. Since 16 September 2013 SARAL/AltiKa OGDRs (Operational Geophysical Data Records) have an operational status and are available from the Data Center. FUTURE EVENTS METOP AHRPT DIRECT READOUT 09 October 2013 12:00 UTC The current Admin Message via Metop-A HRPT will be discontinued and replaced with the Multi-Mission Administrative Message (MMAM), already being used operationally with Metop-B. INFORMATION: For further information, please contact the EUMETSAT User Services Helpdesk Tel: +49 6151 807 366 Fax: +49 6151 807 379 Email:ops@eumetsat.int www.eumetsat.int --------------090606060909050801090708 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit
Topic: Eumetsat Weekly Operations ScheduleDate/Time Issued: September
20, 2013 0324 UTC
Product(s) or Data Impacted: See list below.
Date/Time of Initial Impact: September 20, 2013 06:16:29 UTC (from the Eumetsat Weekly Operations Schedule message)
Date/Time of Expected End: See table in detail for on and off switch time
Length of Outage:
N/A
Details/Specifics of Change:
Weekly Operations Schedule Issued on 20/09/13 at 06:16:29 Seq Nr: 1 Planned activities for week 39/2013: GENERIC SERVICE INFORMATION The EUMETCast Europe service will be upgraded from DVB-S to the DVB-S2 standard in August 2014. For detailed information, please see http://www.eumetsat.int/website/home/DataNewsl Meteosat Straylight. During eclipse seasons, stray light affects the way the spacecraft instrument is commanded. There are periods where the black body calibration is performed after the instrument retrace instead of prior to it. This delays files for the time of the calibration (approximately three minutes) which then affects the data timeliness in the same way. This nominal calibration activity during eclipse seasons will therefore cause periods of noticeable delays to reception of data by Users. Meteosat Straylight Predictions for Autumn/Winter 2013 are available on EUMETSAT Website: http://www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en (See Section "Straylight Predictions (XML)") METEOSAT 0 DEG SERVICE 25 September 2013 13:10 UTC - 24 September 2013 02:00 UTC Co-alignment of the two sun sensor slits on-board Meteosat-10 Risk of degraded image quality during this time period. The following services may be affected: SEVIRI High Rate Meteosat-10 SEVIRI Low Rate Meteosat-10 Meteorological Products Meteosat-10 METEOSAT RSS 23 September 2013 10:00 UTC - 24 September 2013 13:02 UTC Co-alignment of the two sun sensor slits on-board Meteosat-9 Risk of degraded image quality during this time period. The following services may be affected: SEVIRI High Rate Meteosat-9 Meteorological Products Meteosat-9 METEOSAT IODC 03 August 2013 - 29 September 2013 Meteosat-7 Autumn 2013 eclipse season Slots 37 to 43 may not be available. 12 September 2013 - 24 September 2013 Meteosat-7 Sun Co-linearity Slot 16 and 17 may be interrupted or unavailable. 25 September 2013 - 02:58 UTC Meteosat-7 East West Station Keeping Manoeuvre Users may observe degraded image quality for up to 6 hours following the manoeuvre. METOP AND NOAA GLOBAL DATA SERVICE 23 September 2013 08:27 UTC orbit 5266 Metop-B - ASCAT Gain Compression A short outage of all ASCAT products can be expected. 26 September 2013 Metop-B IASI L1 Auxiliary files Update A short outage of all IASI L1 products can be expected. 29 September 2013 05:12 - 09:12 UTC Metop-B - IASI External Calibration IASI GDS Level 1C and Level 2 products will not be available. METOP AHRPT DIRECT READOUT For current information please see: http://oiswww.eumetsat.org/UNS/webapps/showData.do?type=17 THIRD-PARTY DATA AND PRODUCTS 17 August 2013 - 23 October 2013 MTSAT-2 Eclipse Operations The 14:00 and 15:00 images may not be available. Since 16 September 2013 SARAL/AltiKa OGDRs (Operational Geophysical Data Records) have an operational status and are available from the Data Center. FUTURE EVENTS METOP AHRPT DIRECT READOUT 09 October 2013 12:00 UTC The current Admin Message via Metop-A HRPT will be discontinued and replaced with the Multi-Mission Administrative Message (MMAM), already being used operationally with Metop-B. INFORMATION: For further information, please contact the EUMETSAT User Services Helpdesk Tel: +49 6151 807 366 Fax: +49 6151 807 379 Email: ops@eumetsat.int www.eumetsat.int