Subject: Administrative: Eumetsat Weekly Operations Schedule Issued: This is a multi-part message in MIME format. --------------010908020901070300000201 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Topic: *Eumetsat Weekly Operations Schedule *Date/Time Issued**:*October 10, 2013 1450 UTC* * *Product(s) or Data Impacted:*See list below. ** *Date/Time of Initial Impact:* October 10, 2013 14:10:06 UTC (from theEumetsat Weekly Operations Schedule message) ** *Date/Time of Expected End:***See table in detail for on and off switch time****** *Length of Outage:*N/A* * *Details/Specifics of Change: * Weekly Operations Schedule Issued on 10/10/13 at 14:10:06 Seq Nr: 1 Planned activities for week 42/2013: GENERIC SERVICE INFORMATION The EUMETCast Europe service will be upgraded from DVB-S to the DVB-S2 standard in August 2014. For detailed information, please seehttp://www.eumetsat.int/website/home/DataNewsletter/EUMETCast/DAT_2043191.html Meteosat Straylight. During eclipse seasons, stray light affects the way the spacecraft instrument is commanded. There are periods where the black body calibration is performed after the instrument retrace instead of prior to it. This delays files for the time of the calibration (approximately three minutes) which then affects the data timeliness in the same way. This nominal calibration activity during eclipse seasons will therefore cause periods of noticeable delays to reception of data by Users. Meteosat Straylight Predictions for Autumn/Winter 2013 are available on EUMETSAT Website: http://www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en (See Section "Straylight Predictions (XML)") METEOSAT 0 DEG SERVICE 08 October 2013 - 18 October 2013 Sun Co-linearity Repeat cycles 11:30 and 11:45 UTC may be interrupted or not available. 15 October 2013 02:13 UTC Meteosat-10 East West Station Keeping Manoeuvre Users may experience degraded image quality for up to 3 hours following the manoeuvre. Users may experience degraded meteorological product quality for up to 3 hours following the manoeuvre. METEOSAT RSS 07 October 2013 - 17 October 2013 Sun Co-linearity Repeat cycles 11:00 and 11:20 UTC may be interrupted or not available. 15 October 2013 09:00 UTC - 17 October 2013 09:00 UTC Monthly RSS interruption Meteosat-9 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment Maintenance. Meteosat-8 RSS image data, rectified to 9.5 deg E, replaces the Meteosat-9 service. The RSS meteorological product service is not available during this timeframe. METEOSAT IODC 15 October 2013 - 13:58 UTC Meteosat-7 Attitude Slew Manoeuvre Users may observe degraded image quality for up to 6 hours following the manoeuvre. METOP AND NOAA GLOBAL DATA SERVICE 17 October 2013 18:55 - 19:55 UTC (Metop-A) 19:45 - 21:26 UTC (Metop-B) GOME-2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). Near real-time products from O3M SAF (L2 NTO) will be affected (see SAF PRODUCTS below). SAF PRODUCTS 17 October 2013 18:55 - 19:55 UTC (Metop-A) 19:45 - 21:26 UTC (Metop-B) GOME-2 operations (see above), O3M SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. THIRD-PARTY DATA AND PRODUCTS Unavailability of several VITO-provided products due to US Government shutdown The Copernicus Global Land service uses some data from US government services (NASA and NOAA) to create some of its SPOT-VEGETATION derived products. Due to the lapse in US federal government funding, several federal US agencies have been shut down and hence do not provide any data at this moment. Because of this, the production of the FCOVER, LAI and Albedo (both the currently provided version 0 as well as upcoming version 1) and their delivery via EUMETCast, in Near Real Time, are interrupted, starting from the last dekad of September or first dekad of October. The missing products will be provided as soon as the US government services are re-started. 17 August 2013 - 23 October 2013 MTSAT-2 Eclipse Operations The 14:00 and 15:00 images may not be available. 15 October 2013 Enhancement of forecast model products for Africa from the Met Office For full details, please see:http://www.eumetsat.int/website/home/News/DAT_2081067.html FUTURE EVENTS METOP AND NOAA GLOBAL AND REGIONAL DATA SERVICE 05 November 2013 09:00-16:00 UTC Metop-B - Out-of-plane manoeuvre All products from AMSU-A, ASCAT, ATOVS, GOME-2, GRAS, IASI, MHS, SEM, in the Metop Global Data Service and Regional Data Service, will not be available. The AVHRR GDS Level 1 products and AVHRR regional data from Metop-B will be temporarily degraded. A touch-up in-plane manoeuvre may be performed two days later. This will be confirmed in due time. 05 November 2013 10:00 UTC - 8 November 2013 17:00 UTC Metop-A IASI - upload of new software version to the Instrument Management System. All products from Metop-A IASI in the Metop Global Data Service and Regional Data Service will not be available. Exact outage times to be announced. METOP AND NOAA REGIONAL DATA SERVICE 23 October 2013 Update of Operations Software - Local Reception Station (OPS-LRS) to V7.0, including configuration files This new software version will improve the navigation accuracy and will provide a better compatibility between regional and global products. THIRD-PARTY DATA AND PRODUCTS 22 October 2013 03:00 UTC - 19 December 2013 02:00 UTC JMA will switch operations from MTSAT-2 to MTSAT-1R due to ground segment maintenance. MTSAT-1R image data labelled as MTSAT-2 and rectified to 145 degree East will be disseminated. Operations will be switched back to MTSAT-2 on 19 December 2013. INFORMATION: For further information, please contact the EUMETSAT User Services Helpdesk Tel: +49 6151 807 366 Fax: +49 6151 807 379 Email:ops@eumetsat.int www.eumetsat.int --------------010908020901070300000201 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit Topic:  Eumetsat Weekly Operations Schedule

Date/Time Issued: October  10,  2013  1450 UTC

Product(s) or Data Impacted:  See list below.

Date/Time of Initial Impact:  October  10,  2013  14:10:06 UTC  (from the Eumetsat Weekly Operations Schedule message)

Date/Time of Expected End:  See table in detail for on and off switch time  

Length of Outage:  N/A

Details/Specifics of Change:

Weekly Operations Schedule

Issued on 10/10/13 at 14:10:06

Seq Nr: 1

Planned activities for week 42/2013:
GENERIC SERVICE INFORMATION
The EUMETCast Europe service will be upgraded from DVB-S to the DVB-S2
standard in August 2014.
For detailed information, please see http://www.eumetsat.int/website/home/DataNewsl

Meteosat Straylight.
During eclipse seasons, stray light affects the way the spacecraft
instrument is commanded. There are periods where the black body
calibration is performed after the instrument retrace instead
of prior to it. This delays files for the time of the calibration
(approximately three minutes) which then affects the data timeliness
in the same way. This nominal calibration activity during eclipse
seasons will therefore cause periods of noticeable delays to reception
of data by Users.
Meteosat Straylight Predictions for Autumn/Winter 2013	are available
on EUMETSAT Website:
http://www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en
(See Section "Straylight Predictions (XML)")


METEOSAT 0 DEG SERVICE
08 October 2013 - 18 October 2013
Sun Co-linearity
Repeat cycles 11:30 and 11:45 UTC may be interrupted or not available.

15 October 2013  02:13 UTC
Meteosat-10 East West Station Keeping Manoeuvre
Users may experience degraded image quality  for up to 3 hours
following the manoeuvre.
Users may experience degraded meteorological product quality  for up
to 3 hours following the manoeuvre.


METEOSAT RSS
07 October 2013 - 17 October 2013
Sun Co-linearity
Repeat cycles 11:00 and 11:20 UTC may be interrupted or not available.

15 October 2013  09:00 UTC - 17 October 2013  09:00 UTC
Monthly RSS interruption
Meteosat-9 Rapid Scanning Service (RSS) will be suspended for scheduled
Full Earth Scanning and Ground Segment Maintenance.
Meteosat-8 RSS image data, rectified to 9.5 deg E, replaces the
Meteosat-9 service. The RSS meteorological product service is not
available during this timeframe.


METEOSAT IODC
15 October 2013 - 13:58 UTC
Meteosat-7 Attitude Slew Manoeuvre
Users may observe degraded image quality for up to 6 hours following
the manoeuvre.


METOP AND NOAA GLOBAL DATA SERVICE
17 October 2013
18:55 - 19:55 UTC (Metop-A)
19:45 - 21:26 UTC (Metop-B)
GOME-2 monthly measurements of GOME-2 polarisation (PMD) data in raw
readout mode (PMDRAW).
Near real-time products from O3M SAF (L2 NTO) will be affected (see
SAF PRODUCTS below).


SAF PRODUCTS
17 October 2013  18:55 - 19:55 UTC (Metop-A)
		 19:45 - 21:26 UTC (Metop-B)
GOME-2 operations (see above),
O3M SAF Near Real Time Total Column products (Total Column Ozone,
the Total Column NO2, and the Tropospheric NO2) will be unavailable.


THIRD-PARTY DATA AND PRODUCTS
Unavailability of several VITO-provided products due to US Government
shutdown
The Copernicus Global Land service uses some data from US government
services (NASA and NOAA) to create some of its SPOT-VEGETATION derived
products. Due to the lapse in US federal government funding, several
federal US agencies have been shut down and hence do not provide any
data at this moment. Because of this, the production of the FCOVER,
LAI and Albedo (both the currently provided version 0 as well as
upcoming version 1) and their delivery via EUMETCast,  in Near Real
Time, are interrupted, starting from the last dekad of September or
first dekad of October. The missing products will be provided as soon
as the US government services are re-started.

17 August 2013 - 23 October 2013
MTSAT-2 Eclipse Operations
The 14:00 and 15:00 images may not be available.

15 October 2013
Enhancement of forecast model products for Africa from the Met Office
For full details, please see: http://www.eumetsat.int/website/home/News/DAT_2081067.html


FUTURE EVENTS
METOP AND NOAA GLOBAL AND REGIONAL DATA SERVICE
05 November 2013  09:00-16:00 UTC
Metop-B - Out-of-plane manoeuvre
All products from AMSU-A, ASCAT, ATOVS, GOME-2, GRAS, IASI, MHS,
SEM, in the Metop Global Data Service and Regional Data Service,
will not be available.
The AVHRR GDS Level 1 products and AVHRR regional data from Metop-B
will be temporarily degraded.
A touch-up in-plane manoeuvre may be performed two days later. This
will be confirmed in due time.

05 November 2013  10:00 UTC - 8 November 2013 17:00 UTC
Metop-A IASI - upload of new software version to the Instrument
Management System.
All products from Metop-A IASI in the Metop Global Data Service and
Regional Data Service will not be available.
Exact outage times to be announced.


METOP AND NOAA REGIONAL DATA SERVICE
23 October 2013
Update of Operations Software - Local Reception Station (OPS-LRS)
to V7.0, including configuration files
This new software version will improve the navigation accuracy and will
provide a better compatibility between regional and global products.


THIRD-PARTY DATA AND PRODUCTS
22 October 2013 03:00 UTC - 19 December 2013 02:00 UTC
JMA will switch operations from MTSAT-2 to MTSAT-1R due to ground
segment maintenance.
MTSAT-1R image data labelled as MTSAT-2 and rectified to 145 degree
East will be disseminated.
Operations will be switched back to MTSAT-2 on 19 December 2013.



INFORMATION:
For further information, please contact the EUMETSAT User Services
Helpdesk
Tel: +49 6151 807 366
Fax: +49 6151 807 379
Email: ops@eumetsat.int
www.eumetsat.int



                                    



--------------010908020901070300000201--