Subject: Administrative:Notification of Planned ESPC CIP --047d7b6d80b004679b04fa75b67a Content-Type: text/plain; charset=UTF-8 *Topic:* Notification of Planned ESPC CIP Contingency/COOP Exercise *Date/Time Issued: *May 28, 2014 8:28 pm EDT/ 1319 UTC * Date/Time of Initial Impact: *May 28, 2014: 8:30 am EDT/ 12:30 UTC * Date/Time of Expected End:* May 28, 2014: 3:30 pm EDT/ 19:30 UTC * Length of Event: *~ 7 hrs *Product(s) or Data Impacted*: All ESPC products will be affected*. * *Details/Specifics of Change: *The ESPC plans to failover to the Critical Infrastructure Protection (CIP) site on May 28th in support of the ESPC CIP Contingency Exercise. The purpose of the exercise is to validate the ability to failover the ESPC network to the CIP system and the ability to switchback the ESPC network to the NSOF facility after an approximately seven (7) hour duration. This test will be transparent to ESPC users, with the exception of pre-determined non-critical/non-funded products not being available during the test. See link below for products available/not available during the exercise. The ESPC/CIP Contingency Exercise will begin at 8:30am EDT and products should begin distributing from the CIP system by 9:30 am EDT. The CIP site, at Wallops Island, VA will be the operational ESPC system for a total of eight (9) hours. - Network Failover to ESPC/CIP: 1 hour - Product Distribution/Network Sustainability: 5 hours - Network switchback to ESPC/NSOF: 1 hour During the Failover Test, normal problem reporting can be performed utilizing the ESPC Help Desk, at 301-817-3880* Requester:* NA *Contact Information for Further Information:* ESPC Operations at ESPCOperations@noaa.gov at 301-817-3880Detailed information on ESPC/CIP products can be found at the following location: http://www.ssd.noaa.gov/cip.html --047d7b6d80b004679b04fa75b67a Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable
Topi= c:=C2=A0 Notification of Plann= ed ESPC CIP Contingency/COOP Exercise

Date/Time Issued:
= May 28, 2014 8:28 pm EDT<= /span>/ 1319 UTC

Date/Time of Initial Impact:
May 28, 2014: 8:30 am EDT/ 12:30 UTC

Date/Time of Expected End:=C2=A0
May 28, 2014: 3:30 pm EDT/ 19:30 UTC

Length of Event:
~ 7 hrs

Product(s) or Data Impacted:=C2=A0 All ESPC products will be affected.

Details/Specifics of Change: = =C2=A0The ESPC plans to failover to the Critical Infrastructure Protection (CIP) site on May 28th in support of the ESPC CIP Contingency Exercise.

The purpose of the exercise is to validate the ability to failover the ESPC network to the CIP system and the ability to switchback the ESPC network to the NSOF facility after an approximately seven=C2=A0 (7) hour duration.=C2=A0 This test will be transparent to ESPC users, with the exception of pre-determined non-critical/non-funded products not being available during the test. See link below for products available/not available during the exercise.=C2=A0

The ESPC= /CIP Contingency Exercise will begin at 8:30am EDT and products should b= egin distributing from the CIP system by 9:30 am EDT.

The CIP site, at Wallops Island, VA will be the operational ESPC system for a total of eight (9) hours.=C2=A0

During
    the Failov=
er Test, normal problem reporting can be performed utilizing the ESPC
Help =
Desk, at 301-817-3880

Requester: NA

Contact Information for Further Information: ESPC Operations
at ESPCOperations@noa=
a.gov at 301-817-3880

=
Detailed information
on E=
SPC/CIP products can be found at the following location:
     =20
      http://www.ssd.noaa.gov/cip.html