Subject: Product Outage/Anomaly, UPDATE #3: Significant connectivity --047d7b6dce38071d9c04fbcc725c Content-Type: text/plain; charset=UTF-8 UPDATE #3 The anomaly remains ongoing but is showing signs of resolution. UPDATE #2 The anomaly remains ongoing, and the root cause for the outage is still being investigated. The Environmental Satellite Processing Center (ESPC) has power, and work is continuing to bring systems back up. GINI is currently running operationally at the Wallops Command and Data Acquisition Station (WCDAS) in Wallops, VA. LRIT is now being uplinked from the Critical Infrastructure Protection (CIP) feed to the WCDAS, and is currently up. Approved users, including Data Distribution Server (DDS) "pull users", will have an option to pull data from the WCDAS CIP using a different set of IP addresses than ESPC at the NSOF. UPDATE #1: The outage continues; however, GOES Ingest and NOAAPORT Interface (GINI) AWIPS East and West Data were switched to backup systems and are operational. Operational AWIPS products, including Level 2 AWIPS products - GOES LCB, Blended TPW and RR, and the AWIPS composite, are being produced and disseminated. Topic: Significant connectivity issue affecting ESPC Data Center Date/Time: June 14, 2014 1415 UTC Product(s) or Data Impacted: Wide range of applications and associated end-products, including webpages are impacted by this outage. Date/Time of Initial Impact: June 14, 2014 0330 UTC Date/Time of Expected End: Unknown Length of Outage: Ongoing Details/Specifics of Change: At approximately 0330 UTC on June 14, 2014, the Environmental Satellite Processing Center (ESPC) experienced an unknown network connectivity issue, and unable to send or receive products and/or data. Wide range of applications and associated end-products, including webpages are impacted by this outage. GOES Ingest and NOAAPORT Interface (GINI) AWIPS East and West Data were switched to backup systems and are operational. Operational AWIPS products, including Level 2 AWIPS products - GOES LCB, Blended TPW and RR, and the AWIPS composite are being produced and disseminated. GINI is currently running operationally at the Wallops Command and Data Acquisition Station (WCDAS) in Wallops, VA starting with the 0545 UTC East and 0540 UTC West. LRIT is now being uplinked from the Critical Infrastructure Protection (CIP) feed to the Wallops Command and Data Acquisition Station (WCDAS), and is currently up. The anomaly remains ongoing, and the root cause for the outage is still being investigated. The emergency personnel have been recalled and are in the process of bringing systems back up. Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov at 301-817-3880 Web Site(s) for applicable information: http://www.ssd.noaa.gov/PS/SATS/messages.html for this and other satellite related messages. This message was sent to ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note: it make take up to two business days to process your unsubscribe request. --047d7b6dce38071d9c04fbcc725c Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable