Subject: Administrative: Eumetsat Weekly Operations Schedule Issued: This is a multi-part message in MIME format. --------------010805020000050401020501 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit *Topic: *Eumetsat Weekly Operations Schedule *Date/Time Issued**:*November 7 2014 1701 UTC* * *Product(s) or Data Impacted:*See list below. ** *Date/Time of Initial Impact:* **November 7 2014 15:20:49 UTC (from theEumetsat Weekly Operations Schedule message) ** *Date/Time of Expected End:***See table in detail for on and off switch time****** *Length of Outage:*N/A* * *Details/Specifics of Change:* Weekly Operations Schedule Issued on 07/11/14 at 15:20:49 Seq Nr: 2 Planned activities for week 46/2014: GENERIC SERVICE INFORMATION 14 August - 31 December 2014 The EUMETCast-Europe DVB-S2 Basic Service is operational. A parallel operational phase with DVB-S is provided till 31 December 2014, at which date the DVB-S service will end. Further information is available:http://www.eumetsat.int/website/home/News/DAT_2305543.html Meteosat Straylight. Meteosat Straylight Predictions for Winter/Spring 2014 are available on EUMETSAT Website: www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en (See section "Straylight Predictions (XML)") METEOSAT 0 DEG SERVICE From 4 November 2014 The SEVIRI HRV upper window will be shifted Westwards daily at 17:00 UTC in order to cover the Azores and then moved back in its original position at 00:00 UTC. This will be done for a trial period of one month, after which, unless differently announced it is foreseen that the HRV upper window movement will be applied operationally. For full details, see:www.eumetsat.int/website/home/News/DAT_2354871.html METOP, S-NPP AND NOAA GLOBAL DATA SERVICE 12 November 2014 S-NPP - Inclination Adjustment Manoeuvre (IAM) ATMS data will be unavailable during this period. 13 November 01:00 - 04:00 UTC 14 November 02:00 - 05:00 UTC 15 November 01:35 - 04:35 UTC 16 November 01:15 - 04:15 UTC 16 November 23:10 - 17 November 04:10 UTC McMurdo Maintenance The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system may be interrupted during these periods and only nominal Arctic timeliness may be available. METOP, S-NPP AND NOAA GLOBAL AND REGIONAL DATA SERVICE 01 October - 30 December 2014 Metop-A - ASCAT Extensive Calibration Short outages of the ASCAT GDS Level 1, soil moisture and global and regional winds products can be expected, during satellite passes over Turkey. METOP AHRPT DIRECT READOUT 11 November 2014 09:02 - 09:08 UTC (Metop-A) 11 November 2014 08:14 - 08:20 UTC (Metop-B) SEM MPED in flight calibration A short outage of all SEM products can be expected at these times. DATA CENTRE (***** UPDATE *****) 11 November 2014 09:00 UTC - 13 November 2014 16:00 UTC Major Data Centre Upgrade: Due to a system upgrade, archive data ordering and ordering processing will be suspended during this time. THIRD-PARTY DATA AND PRODUCTS 10 November 2014 03:00 UTC - 28 November 2014 02:00 UTC MTSAT-2 JMA will switch operations from MTSAT-2 to MTSAT-1R due to ground segment maintenance. MTSAT-1R image data labelled as MTSAT-2 and rectified to 145 degree East will be disseminated. FUTURE EVENTS METOP AND NOAA GLOBAL DATA SERVICE 25 November 2014 - 27 November 2014 Metop-A - IASI Parameter update for Compensation device test. IASI GDS Level 1C and Level 2 products will not be available during the following times. 25 November 2014 07:51 UTC - 08:41 UTC 26 November 2014 05:08 UTC - 09:06 UTC 27 November 2014 08:52 UTC - 09:41 UTC INFORMATION: For further information, please contact the EUMETSAT User Services Helpdesk Tel: +49 6151 807 366 Fax: +49 6151 807 379 Email:ops@eumetsat.int www.eumetsat.int --------------010805020000050401020501 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit Topic:  Eumetsat Weekly Operations Schedule

Date/Time Issued:  November 7  2014  1701 UTC

Product(s) or Data Impacted:  See list below.

Date/Time of Initial Impact:  November 7  2014  15:20:49 UTC  (from the Eumetsat Weekly Operations Schedule message)

Date/Time of Expected End:  See table in detail for on and off switch time  

Length of Outage:  N/A

Details/Specifics of Change:

Weekly Operations Schedule

Issued on 07/11/14 at 15:20:49

Seq Nr: 2

Planned activities for week 46/2014:

GENERIC SERVICE INFORMATION
14 August - 31 December 2014
The EUMETCast-Europe DVB-S2 Basic Service is operational. A parallel
operational phase with DVB-S is provided till 31 December 2014,
at which date the DVB-S service will end.
Further information is available: http://www.eumetsat.int/website/home/News/DAT_2305543.html

Meteosat Straylight.
Meteosat Straylight Predictions for Winter/Spring 2014 are available
on EUMETSAT Website:
www.eumetsat.int/Home/Main/ServiceStatus/index.htm?l=en
(See section "Straylight Predictions (XML)")


METEOSAT 0 DEG SERVICE
>From 4 November 2014
The SEVIRI HRV upper window will be shifted Westwards daily at 17:00
UTC in order to cover the Azores and then moved back in its original
position at 00:00 UTC. This will be done for a trial period of one
month, after which, unless differently announced it is foreseen that
the HRV upper window movement will be applied operationally. For
full details, see: www.eumetsat.int/website/home/News/DAT_2354871.html


METOP, S-NPP AND NOAA GLOBAL DATA SERVICE
12 November 2014
S-NPP - Inclination Adjustment Manoeuvre (IAM) ATMS data will be
unavailable during this period.

13 November 01:00 - 04:00 UTC
14 November 02:00 - 05:00 UTC
15 November 01:35 - 04:35 UTC
16 November 01:15 - 04:15 UTC
16 November 23:10 -  17 November 04:10 UTC
McMurdo Maintenance The enhanced timeliness achieved for Metop-B
data through the Antarctic Data Acquisition (ADA) system may be
interrupted during these periods and only nominal Arctic timeliness
may be available.


METOP, S-NPP AND NOAA GLOBAL AND REGIONAL DATA SERVICE
01 October - 30 December 2014
Metop-A - ASCAT Extensive Calibration
Short outages of the ASCAT GDS Level 1, soil moisture and global
and regional winds products can be expected, during satellite passes
over Turkey.


METOP AHRPT DIRECT READOUT
11 November 2014 09:02 - 09:08 UTC (Metop-A)
11 November 2014 08:14 - 08:20 UTC (Metop-B) SEM MPED in flight
calibration A short outage of all SEM products can be expected at
these times.


DATA CENTRE  (***** UPDATE *****)
11 November 2014  09:00 UTC - 13 November 2014	16:00 UTC
Major Data Centre Upgrade: Due to a system upgrade, archive data
ordering and ordering processing will be suspended during this time.


THIRD-PARTY DATA AND PRODUCTS
10 November 2014 03:00 UTC - 28 November 2014 02:00 UTC
MTSAT-2
JMA will switch operations from MTSAT-2 to MTSAT-1R due to ground
segment maintenance.
MTSAT-1R image data labelled as MTSAT-2 and rectified to 145 degree
East will be disseminated.


FUTURE EVENTS
METOP AND NOAA GLOBAL DATA SERVICE
25 November 2014 - 27 November 2014
Metop-A - IASI Parameter update for Compensation device test.
IASI GDS Level 1C and Level 2 products will not be available during
the following times.
25 November 2014 07:51 UTC - 08:41 UTC
26 November 2014 05:08 UTC - 09:06 UTC
27 November 2014 08:52 UTC - 09:41 UTC




INFORMATION:
For further information, please contact the EUMETSAT User Services
Helpdesk
Tel: +49 6151 807 366
Fax: +49 6151 807 379
Email: ops@eumetsat.int
www.eumetsat.int


--------------010805020000050401020501--