Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: Maintenance in-plane manoeuvre. Reduced data quality
should be expected for data sensed during this period. GRAS
products
will be degraded for up to 4 hours following the manoeuvre. The
exact burn time will be announced in due course. [Rev 2]: Update of
burn time. Burn duration = 4.436 seconds.
Status: scheduled
Issue Time: 2016-02-02 10:59:11.0
Services: SEM L0 - Metop-B
MHS Level 1 - Metop-B
HIRS Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
AVHRR Level 1 - Metop-B
IASI Level 1 - Metop-B
ASCAT Level 1 - Metop-B
GRAS Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
ASCAT Soil Moisture - Metop-B
EARS-ATOVS
EARS-AVHRR
EARS-IASI
EARS-ASCAT
AVHRR AHRPT Metop-B
GOME-2 AHRPT Metop-B
ASCAT AHRPT Metop-B
HIRS AHRPT Metop-B
GRAS AHRPT Metop-B
AMSU-A AHRPT Metop-B
IASI AHRPT Metop-B
SEM AHRPT Metop-B
MHS AHRPT Metop-B
OSI SAF - Products
O3M SAF - Products
H-SAF - Products
ROM SAF - Products
Type: Planned Maintenance
Ann Nr: 1590
Rev: 1
Start Time: 2016-02-11 19:00:00.0
End Time: 2016-02-12 05:00:00.0