Subject: product-change
Detail: Maintenance upgrade of the NRT processing system
at ROM
SAF. The data quality will not change, but the reference azimuth
angle (descriptor 0 05 021 in BUFR, Data Field 36) will be the one
provided by EUMETSAT instead of the one computed at the ROM SAF.
Additionaly, the 1Dvar solution for occultations that fail
the 1Dvar
qualitiy check will then also be available, but with a quality flag
(descriptor 0 33 039 in BUFR, bit 7) indicating that
'Meteorological
processing' was non-nominal. [Rev 2]: This upgrade has been
postponed by ROM-SAF. ROM-SAF is appreciating user feedback on this
upgrade until Thursday 25/02/2016.
Status: postponed
Issue Time: 2016-02-19 14:33:00.0
Services: ROM SAF - Products
Type: Planned Maintenance
Ann Nr: 1631
Rev: 1
Start Time: 2016-02-22 09:30:00.0
End Time: 2016-02-22 14:45:00.0