Subject: ground-segment-maintenance Impact: risk-of-interruption Detail: Essential Svalbard Ground Station maintenance. There is a risk for interruptions during the indicated time period. [Rev. 2]: Change of maintenance end time from 06/08/2016 to 18/07/2016. Status: scheduled Issue Time: 2016-06-29 14:33:35.0 Services: SEM L0 - Metop-A AVHRR Level 1 - Metop-A AMSU-A Level 1 - Metop-A MHS Level 1 - Metop-A HIRS Level 1 - Metop-A ASCAT Level 1 - Metop-A IASI Level 1 - Metop-A GRAS Level 1 - Metop-A ATOVS Sounding products - Metop-A GOME-2 Level 1 - Metop-A IASI Sounding Products - Metop-A ASCAT Soil Moisture - Metop-A AVHRR Polar Winds - Metop-A Multi-Sensor Products - Metop-A SEM L0 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B AMSU-A Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Type: Planned Maintenance Ann Nr: 1977 Rev: 1 Start Time: 2016-07-05 08:00:00.0 End Time: 2016-07-07 15:00:00.0