Subject: instrument-calibration Impact: data-unavailable Detail: IASI External Calibration (Moon Intrusion). Short interruptions can be expected. Status: scheduled Issue Time: 2016-09-14 12:21:34.0 Services: IASI Level 1 - Metop-B IASI AHRPT Metop-B EARS-IASI Type: Planned Maintenance Ann Nr: 2199 Rev: 1 Start Time: 2016-09-20 08:12:00.0 End Time: 2016-09-20 08:19:00.0 Satellites: Metop-A Subsystem: SEM Component: MEPED