Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: Essential Svalbard Ground Station maintenance. There
is
a risk for interruptions during the indicated time period.
Status: scheduled
Issue Time: 2016-09-06 09:25:26.0
Services: AVHRR Level 1 - Metop-A
HIRS Level 1 - Metop-A
AMSU-A Level 1 - Metop-A
SEM L0 - Metop-A
MHS Level 1 - Metop-A
IASI Level 1 - Metop-A
ASCAT Level 1 - Metop-A
GRAS Level 1 - Metop-A
GOME-2 Level 1 - Metop-A
ATOVS Sounding products - Metop-A
IASI Sounding Products - Metop-A
AVHRR Polar Winds - Metop-A
Multi-Sensor Products - Metop-A
ASCAT Soil Moisture - Metop-A
SEM L0 - Metop-B
AMSU-A Level 1 - Metop-B
HIRS Level 1 - Metop-B
AVHRR Level 1 - Metop-B
MHS Level 1 - Metop-B
IASI Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
GRAS Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
ASCAT Level 1 - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
EARS-IASI
EARS-ASCAT
EARS-AVHRR
EARS-NWC
EARS-ATOVS
Type: Service Enhancement
Ann Nr: 2236
Rev: 1
Start Time: 2016-09-22 00:00:00.0