Subject: in-plane-manoeuvre
Detail: Routine in-plane manoeuvre. Reduced data quality
should be expected for data sensed during this period. The exact
burn time will be announced closer to the day of the
manoeuvre.[Rev. 2] Update the start date. [Rev. 3] The manoeuvre
has been postponed by one week to 02/11/2016.
Status: scheduled
Issue Time: 2016-09-28 13:58:16.0
Services: HIRS Level 1 - Metop-B
SEM L0 - Metop-B
MHS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
AVHRR Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
IASI Sounding Products - Metop-B
ATOVS Sounding products - Metop-B
ASCAT Soil Moisture - Metop-B
IASI Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
GRAS Level 1 - Metop-B
Multi-Sensor Products - Metop-B
AVHRR Polar Winds - Metop-B
EARS-AVHRR
EARS-ATOVS
EARS-IASI
EARS-ASCAT
A-DCS AHRPT Metop-B
AMSU-A AHRPT Metop-B
HIRS AHRPT Metop-B
ASCAT AHRPT Metop-B
AVHRR AHRPT Metop-B
GOME-2 AHRPT Metop-B
GRAS AHRPT Metop-B
MHS AHRPT Metop-B
SEM AHRPT Metop-B
IASI AHRPT Metop-B
NWC SAF - Products
OSI SAF - Products
CM SAF - Products
NWP SAF - Products
O3M SAF - Products
LSA SAF - Products
ROM SAF - Products
H-SAF - Products
Type: Service Enhancement
Ann Nr: 2229
Rev: 1
Start Time: 2016-11-09 15:00:00.0