Subject: ground-segment-maintenance Impact: data-delayed Detail: There is a risk that the enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness might be available during this period. Status: scheduled Issue Time: 2016-11-14 09:39:29.0 Services: AVHRR Level 1 - Metop-B SEM L0 - Metop-B AMSU-A Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B GRAS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GOME-2 Level 1 - Metop-B IASI Sounding Products - Metop-B ATOVS Sounding products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products Type: Planned Maintenance Ann Nr: 2363 Rev: 1 Start Time: 2016-11-17 06:40:00.0 End Time: 2016-11-17 07:00:00.0 Satellites: Sentinel-3A