Subject: Administrative:Update #1, Notification of MPLS Failover, This is a multi-part message in MIME format. --Boundary_(ID_KE8ACu6hfyB78boj9/Huhg) Content-type: text/plain; charset=utf-8; format=flowed Content-transfer-encoding: 8BIT *Update #1:* ******** ******** The MPLS failover has been changed to Tuesday, March 28 – Thursday, March 30, 2017 and the backup dates are Tuesday, April 4 – Thursday, April 6, 2017 to conduct a MPLS failover. *Issue #1 Family of Services (FOS)-CIP* The FOS-CIP server failed with a hardware failure.The SA rebuilt a replacement server on the VMware cluster and spent a couple weeks trying to get it working before finding out the Unidata developers have also had issues getting LDM to receive FOS data on a virtual platform.The SA is now begun building a bare-metal server here at NSOF (PowerEdge R710, CD0001675384, Serial #3Y3KJN1) that will be relocated down to Wallops on Thursday, March 2 to be implemented.If FOS-CIP is not up and running for the MPLS failover, listed below are the products that will be affected: SATEPSPROD1: Imager ASOS GICP GSIP ABBA SATEPSPROD2: CSBT AWIPS Composite SATEPSPROD3: HD Winds can use FOS but will not fail without TRaP *** not running at CIP FIMMA SATEPSPROD4: SFOV *** not running at CIP Additional: LDM Lightening Winds Profiler RADAR SAB Users - WXTLIST ORA Users Nancy's web products *Issue #2*: The DDSPROD-CIP server failed while attempting to install Powerpath. The SA is currently working with IBM to resolve this issue but at this moment the virtual will not boot. *Issue #3*: The HMS application due to an updated code needs to be moved to Gp60-CIP from Gp55-CIP. We will need to expand resources on gp60- CIP at which point the programmer expects to require a week to complete the work. The CCR went through the CCB today. * Topic:* **Notification of MPLS Failover *Date/Time Issued:* March 2, 20171715Z *Date/Time of Initial Impact: *March 15, 2017, 8:31am EDT / 1231Z *Date/Time of Expected End:*March 15, 2017, 2:00 pm EDT / 1800Z *Length of Outage: *Approx. 5.5 hours *Product(s) or Data Impacted: *ALL CIP Products except for the following: JPSS, NDE, GOES-R. This data "WILL NOT" be available during the Failover. *Details/Specifics of Change:* The ESPC Critical Infrastructure Protection (CIP) site has been Activated early to avoid ramp up time for the products to reach optimum capability and to meet the Quarterly requirement to verify ESPC/CIP capabilities/functionality and preparation for the Failover on March 15, 2017. During this CIP Activation, our goal is for all users to test their connections within the scheduled time of the failover. Use the following number to call for validation: Details: MPLS Failover Operation Conference Room: TBA Wednesday, March 15, 2017 8:00 AM – 5:00 PM Call in: TBA Leader: TBA Participant: TBA Schedule: MPLS will begin on March 15 or 16, 2017, 8:31 am EDT / 1231Z (Pending Critical Weather Issued) Priority 1 Products will meet their optimum capability 24 hours after activation. Priority 2 Products will meet their optimum capability 48 hours after activation. CIP Failover Testing will occur on March 15 or 16, 2017 at 8:31 am EDT / 1231Z (Pending Critical Weather Issued) The ESPC/CIP, in Wallops Island, will remain activated until March (day - TBA), 2017, 1800Z / 2:00 pm EDT, at which time the CIP will be deactivated. *Contact Information for Further Information:* ESPC Operations at ESPCOperations@noaa.gov at 301-817-3880 * Web Site(s) for applicable information:* http://www.ssd.noaa.gov/cip.html Detailed information on ESPC/CIP products can be found at the following location: http://www.ssd.noaa.gov/cip.html This message was sent from ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note: it may take up to two business days to process your unsubscribe request. ** --Boundary_(ID_KE8ACu6hfyB78boj9/Huhg) Content-type: text/html; charset=utf-8 Content-transfer-encoding: 8BIT Update #1:

The MPLS failover has been changed to Tuesday, March 28 – Thursday, March 30, 2017 and the backup dates are Tuesday, April 4 – Thursday, April 6, 2017 to conduct a MPLS failover.

Issue #1  Family of Services (FOS)-CIP

The FOS-CIP server failed with a hardware failure.  The SA rebuilt a replacement server on the VMware cluster and spent a couple weeks trying to get it working before finding out the Unidata developers have also had issues getting LDM to receive FOS data on a virtual platform.  The SA is now begun building a bare-metal server here at NSOF (PowerEdge R710, CD0001675384, Serial #3Y3KJN1) that will be relocated down to Wallops on Thursday, March 2 to be implemented.  If FOS-CIP is not up and running for the MPLS failover, listed below are the products that will be affected:

SATEPSPROD1:

Imager ASOS

GICP

GSIP

ABBA

SATEPSPROD2:

CSBT

AWIPS Composite

SATEPSPROD3:

HD Winds can use FOS but will not fail without

TRaP *** not running at CIP

FIMMA

SATEPSPROD4:

SFOV *** not running at CIP

Additional:

LDM

Lightening

Winds Profiler

RADAR

SAB Users - WXTLIST

ORA Users

Nancy's web products

Issue #2: The DDSPROD-CIP server failed while attempting to install Powerpath.  The SA is currently working with IBM to resolve this issue but at this moment the virtual will not boot.

Issue #3: The HMS application due to an updated code needs to be moved to Gp60-CIP from Gp55-CIP.  We will need to expand resources on gp60- CIP at which point the programmer expects to require a week to complete the work.  The CCR went through the CCB today.

Topic:
  Notification of MPLS Failover

Date/Time Issued:   March 2, 2017 1715Z

Date/Time of Initial Impact:      March 15, 2017, 8:31am EDT / 1231Z

Date/Time of Expected End:  March 15, 2017, 2:00 pm EDT / 1800Z

Length of Outage:   Approx. 5.5 hours

Product(s) or Data Impacted:  ALL CIP Products except for the following: JPSS, NDE, GOES-R.  This data "WILL NOT" be available during the Failover.

Details/Specifics of Change:

The ESPC Critical Infrastructure Protection (CIP) site has been Activated early to avoid ramp up time for the products to reach optimum capability and to meet the Quarterly requirement to verify ESPC/CIP capabilities/functionality and preparation for the Failover on March 15, 2017.  During this CIP Activation, our goal is for all users to test their connections within the scheduled time of the failover.  Use the following number to call for validation:

Details:
MPLS Failover Operation
Conference Room: TBA
Wednesday, March 15, 2017 8:00 AM – 5:00 PM
Call in: TBA
Leader:  TBA
Participant: TBA

Schedule:
MPLS will begin on March 15 or 16, 2017, 8:31 am EDT / 1231Z (Pending Critical Weather Issued)
Priority 1 Products will meet their optimum capability 24 hours after activation.
Priority 2 Products will meet their optimum capability 48 hours after activation.
CIP Failover Testing will occur on March 15 or 16, 2017 at 8:31 am EDT / 1231Z (Pending Critical Weather Issued)
The ESPC/CIP, in Wallops Island, will remain activated until March (day - TBA), 2017, 1800Z / 2:00 pm EDT, at which time the CIP will be deactivated.

Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov at 301-817-3880

Web Site(s) for applicable information:
  http://www.ssd.noaa.gov/cip.html

Detailed information on ESPC/CIP products can be found at the following location:
http://www.ssd.noaa.gov/cip.html



This message was sent from ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note: it may take up to two business days to process your unsubscribe request.