>Subject:ground-segment-maintenanceImpact:risk-of-interruption= Detail:Due to ground segment = maintenance a period of up to two hours of interruption might be observed d= uring the mentioned period.= Status:scheduledIssue Time:2018-03-21 15:49:23.0Services:SEM L0 - Metop-A
AVHRR L= evel 1 - Metop-A
AMSU-A Level 1 - Metop-A
MHS Level 1 - Metop-A
GR= AS Level 1 - Metop-A
ASCAT Level 1 - Metop-A
IASI Level 1 - Metop-AHIRS Level 1 - Metop-A
GOME-2 Level 1 - Metop-A
ATOVS Sounding prod= ucts - Metop-A
IASI Sounding Products - Metop-A
ASCAT Soil Moisture -= Metop-A
AVHRR Polar Winds - Metop-A
Multi-Sensor Products - Metop-A<= br>SEM L0 - Metop-B
AMSU-A Level 1 - Metop-B
AVHRR Level 1 - Metop-B<= br>MHS Level 1 - Metop-B
HIRS Level 1 - Metop-B
IASI Level 1 - Metop-= B
ASCAT Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ATOVS Sounding = products - Metop-B
GRAS Level 1 - Metop-B
ASCAT Soil Moisture - Metop= -B
IASI Sounding Products - Metop-B
AVHRR Polar Winds - Metop-B
Mu= lti-Sensor Products - Metop-B
Multi-Metop Wind Products
AMSU-A Level = 1 - NOAA
AVHRR Level 1 - NOAA
MHS Level 1 - NOAA
HIRS Level 1 - NO= AA
ATOVS Sounding products - NOAA
OSI SAF - Products
AC SAF - Prod= ucts
ROM SAF - Products
H-SAF - Products

Type:Planned Maintenance
Ann Nr:3691
Rev:1
Start Time:2018-03-29 18:50:00.0
End Time:2018= -03-29 19:49:00.0
Satellites:Metop-A
Subsystem:GOME-2