-size:11px">Subject:instrument-calibration<= td nowrap class=3D"gmail-m_188441820679421468detailLabel" width=3D"10%" ali= gn=3D"RIGHT" style=3D"font-family:Arial,Verdana,sans-serif;margin:0px;backg= round-color:rgb(250,250,250);color:rgb(77,77,77);font-weight:bold;text-alig= n:right;border-bottom:1px solid rgb(171,171,171);border-right:1px solid rgb= (171,171,171);font-size:11px">Impact:data-unavailableDetail:GOME2 monthly m= easurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW).= The AC SAF Near Real Time Total Column products (Total Column Ozone, the T= otal Column NO2, and the Tropospheric NO2) will be unavailable.Status:scheduledIssue Time:2018-03-2= 1 15:42:03.0Services:GOME-2 Level 1 - Metop-A
GOME-2 AHRPT Metop-A
AC SAF - Produ= cts

= <= td nowrap class=3D"gmail-m_188441820679421468detailLabel" width=3D"10%" ali= gn=3D"RIGHT" style=3D"font-family:Arial,Verdana,sans-serif;margin:0px;backg= round-color:rgb(250,250,250);color:rgb(77,77,77);font-weight:bold;text-alig= n:right;border-bottom:1px solid rgb(171,171,171);border-right:1px solid rgb= (171,171,171);font-size:11px">Satellites:=
Type:Planned Mainte= nance
Ann Nr:3692
Rev:1
Start Time:2018-03-2= 9 19:44:00.0
<= /u>End Time:2018-03-29 20:43:00.0
Metop-B
Subsystem:GOME-2