Subject: in-plane-manoeuvre Impact: data-degraded Detail: 2nd manoeuvre to achieve the Interleaved Long Repeat Orbit (LRO) i.e. ground track shift of 4 km in cross-track direction for refining the 8 km LRO grid followed since July 2017. The semi-major axis will be increased by 250 m. The exact time of this 2nd manoeuvre will be known after having assessed the results from the 1st manoeuvre. OGDR products may be degraded 30 minutes before and up to 2 hours after the manoeuvre. Status: scheduled Issue Time: 2018-07-11 15:31:08.0 Services: Jason-2 OGDR Type: Planned Maintenance Ann Nr: 3982 Rev: 1 Start Time: 2018-07-19 09:30:00.0 End Time: 2018-07-19 10:00:00.0 Satellites: Metop-B