TXPQ23 KNES 090313 TCSWNP A. 05W (NONAME) B. 09/0232Z C. 15.3N D. 119.4E E. FIVE/MTSAT F. T2.0/2.0/D1.5/24HRS G. IR/EIR/VIS H. REMARKS...VERY IMPRESSIVE CURVATURE AND ORGANIZATION OF LLC SEEN IN TMI AND VIS WITH .55 BANDING MEASURED FOR DT OF 2.5. HOWEVER...EIR WAS NOT IMPRESSIVE AT ALL WITH WARM BROKEN BANDED CONVECTION LIMITED TO .3 YIELDING A DT OF 2.0 IF GENEROUS. MET IS 2.0 FOR RAPID DEVELOPMENT COMPARED TO YESTERDAY AND PT IS 2.0. GIVEN CONSISTENCY OF DT OVER LAST 18HRS WAS CONSIDERING INCREASE OF FT OF 1.0/6HR BUT GIVEN INCONSISTENCY IN PRESENTATION ACROSS EACH BAND (VIS AND EIR) REJECTED THE DT AND FT IS BASED ON MET MAKING A .5 INCREASE IN 6HRS WHICH IS MORE IN LINE WITH TRADITIONAL DVORAK DEVELOPMENT TREND...PARTICULARLY IN THESE EARLY STAGES. POSITION ACCURATE TO WITHIN 20 NM (37 KM). I. ADDL POSITIONS NIL ...GALLINA