TXPZ25 KNES 200615 TCSENP A. 17E (NONAME) B. 20/0545Z C. 14.3N D. 101.3W E. THREE/GOES-E F. T2.5/2.5/D1.5/18HRS G. IR/EIR/SWIR/SSMIS H. REMARKS...CENTER IS REPOSITIONED BASED ON 0249Z SSMIS AND ANIMATED EIR IMAGERY. 0249Z SSMIS SHOWED A WELL DEFINED CIRCULATION WITH BANDING THAT MEASURED 9/10. THE AVERAGE DT CALCULATED EACH HOUR OVER THE LAST 6 HOURS ENDING AT 0545Z WAS 2.7. AT 0545Z BANDING MEASURED 4/10 FOR A DT OF 2.5. THE SIX HOUR AVERAGE DT JUSTIFIES BREAKING DVORAK CONSTRAINTS WHICH LIMIT CHANGES IN FT TO 0.5 OVER 6 HOURS IN THE EARLY STAGES OF DEVELOPMENT AND WHICH REQUIRE THAT THE FT BE LESS THAN 2.5 24 HOURS AFTER THE INITIAL T1.0. THE MET OF 1.5 REFLECTS THE RAPID DEVELOPMENT THAT HAS OCCURRED OVER THE LAST 24 HOURS. THE PT IS 2.0. FT IS BASED ON RAPID INTENSIFICATION. I. ADDL POSITIONS 20/0249Z 14.0N 100.8W SSMIS ...TURK